The City of North Richland Hills is seeking bids for the Iron Horse Sanitary Sewer Aerial Crossing Replacement project. The project involves replacing 109 linear feet of an existing 10” DI SS aerial crossing with 109 linear feet of 10” PVC SS and 80 linear feet of 16” steel casing. The project also includes modifying three existing piers. The bid tabulation statement lists the bids from five vendors, with the total base bid amounts ranging from $88,880 to $242,920. The city reserves the right to reject any or all bids.
• The project includes several different methods of installation, including open cut and aerial crossing.
• The deadline for receipt of written questions was September 13, 2017.
• A pre-bid conference was held on September 6, 2017.
• The city will make a determination as to the responsiveness of bids submitted based on compliance with all applicable laws and project documents.