This contract covers the full removal, repair, and replacement of the exterior water‑management system on the historic Old Main Pump Building. The work includes taking off existing wood brackets, installing fabricated copper brackets, a tapered 16 oz copper gutter and downspout system, applying a Grace Ice & Water Shield waterproofing membrane, repairing/replacing roof tiles, and installing snow‑guards. All labor, materials, equipment, and related services are to be provided as a lump‑sum, with compliance to prevailing‑wage, safety, and environmental statutes.
• Scope: ~230 ft of copper fascia, hidden gutters, soffit, and cornice; 4 × 5 in. downspouts; copper brackets; waterproofing; tile removal and replacement; snow‑guards.
• Schedule: Work must be completed by September 1 2022; liquidated damages of $300 per day apply for overruns.
• Compliance: Requires 10 % bid bond, 100 % performance bond, insurance minimums, prevailing‑wage payroll reporting, and a 2‑year warranty on all work.