Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›NW Bellevue Walkways and Safety Improvements

Awarded contract·City of Bellevue·Washington

NW Bellevue Walkways and Safety Improvements

Won by Marshbank Construction +10 more$7.7MMultiple Award
Contract source

Awarded vendors

  • Marshbank Construction
  • Johansen Construction Co
  • Pivetta Brothers Construction
  • Gary Merlino Construction Company
  • Sunset Grill Construction
  • Active Construction Inc. (ACI)
  • Earthwork Solutions LLC (EWS)
  • Interwest Construction, Inc. (ICI)
  • Kamins Construction
  • Fury Site Works, Inc.
  • Active Construction Inc. (ACI)

Description

The City of Bellevue is seeking bids for the NW Bellevue Walkways and Safety Improvements project. The project involves various construction activities such as clearing and grubbing, removing asphalt pavement, installing new water mains, and constructing storm drainage improvements. The engineer's estimate for the project is $7,735,572.00. The bid submission date was July 31, 2025, and the bid opening room was MS Teams. • The project requires clearing and grubbing, removing asphalt pavement, and installing new water mains. • The project also involves constructing storm drainage improvements, engineered gravity block walls, and cement concrete curb, gutter, sidewalk, and driveway approaches. • The project requires the installation of bollards, metal railings, rectangular rapid flash beacon systems, radar signs, and communication systems. • The project also involves grinding and overlaying asphalt pavement, installing irrigation systems, and landscaping. • The project requires channelization and signing, as well as property restoration and miscellaneous work.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
25022

Contract value

$7,735,572

Based on the engineer's estimate, the contract value is approximately $7,735,572.00. However, the bids submitted by the vendors range from $6,090,960.50 to $9,240,822.50, so the actual contract value may be different. The engineer's estimate is likely based on the scope of work, materials, and labor required for the project. The bids submitted by the vendors may have varied based on their own estimates of the costs involved.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Seattle·Washington

Top match · 69%

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Town of Westwood·Massachusetts

67% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Seattle·Washington

67% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Transportation·Hawaii

66% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

City of Bellevue·Washington

65% match

Ashwood Park Chainlink Fence Installation

Closes 11/5/2026Opened 10/22/2026

City of Seattle·Washington

64% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Richmond Government·Virginia

64% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Bellevue·Washington

64% match

Meydenbauer Bay Park Phase 2 - GC/CM Services

Closes 12/4/2026Opened 10/22/2026

City of North Augusta·South Carolina

64% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

Maryland State Highway Administration·Maryland

64% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Town of Bluffton·South Carolina

63% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Illinois Tollway·Illinois

63% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of State·United States of America

63% match

Sliding Gate Safety Deficiencies Remediation

Closes 12/31/2026Opened 7/16/2026

City of Charlotte·North Carolina

63% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

Mansfield Housing Authority·Massachusetts

63% match

Courtyard Renovation: Doors, Storms, Painting & Railing Replacement

Closes 11/4/2026Opened 8/26/2026

City of Charlotte·North Carolina

63% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Bellevue·Washington

63% match

Streets On-Call Tree and Vegetation Maintenance

Closes 11/5/2026Opened 10/8/2026

City of Vernon·California

63% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Miami-Dade County·Florida

62% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

City of Green Bay·Wisconsin

62% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Charlotte·North Carolina

62% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

NYS East Fishkill, Town of·New York

62% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Missouri Department of Transportation·Missouri

62% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Bellevue·Washington

62% match

Bellevue Airfield Park Geotechnical Engineering Services

Closes 11/19/2026Opened 10/29/2026

Virginia Department of Transportation·Virginia

62% match

B36_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026