The City of Olathe is seeking a vendor to furnish and install two wet well mounted, suction lift, sewage lift stations with two constant speed electric driven pumps and fully automatic operation. The contract was awarded to four vendors: Smith & Loveless, USEMCO Inc., EDWARDS EQUIPMENT, LLC, and JCI Industries, Inc. The total cost for the Robinson Campus Lift Station is $83,576.00, and the total cost for the Old 56 Hwy Lift Station is $89,775.00. The contract includes the installation of the lift stations and all associated work.
• The contract is for the replacement of two lift stations
• The contract includes the installation of two constant speed electric driven pumps and fully automatic operation
• The contract was awarded to four vendors
• The total cost for the Robinson Campus Lift Station is $83,576.00
• The total cost for the Old 56 Hwy Lift Station is $89,775.00