This contract is for the excavation of Arbor Oaks Stormwater Detention Basins for the Harris County Flood Control District. The project involves the construction of four regional stormwater detention basins to reduce the risk of flooding in the area. The contract was awarded to Sprint Sand & Clay, LLC, with a total price of $18,840,241.44. The scope of work includes site preparation, excavation, and installation of pipes and other infrastructure. The project is funded through a combination of local funding and federal grants. Key aspects of the contract include:
• The contract duration is 1 year
• The contract value is $18,840,241.44
• The project is located in the White Oak Bayou Watershed
• The project aims to reduce the risk of flooding in the Arbor Oaks and Greater Inwood neighborhoods
• The contract was awarded through a competitive bidding process