The contract is for the construction of the CUCF Central Control Scada Replacement and Upgrades project. The project includes the demolition of the existing system and the new installation of a SCADA system, including PLCs, HMIs, and networking PLCs across the Henry and Administration buildings. The contract was awarded to two vendors, Wasatch Controls and Cache Valley Electric, with bid prices of $319,438.00 and $403,797.00, respectively. The project is expected to start on 3/13/2025 and end on 10/10/2025. The key features of the project include:
• Demolition of the existing SCADA system
• Installation of a new SCADA system, including PLCs, HMIs, and networking PLCs
• Perimeter doors monitoring and control
• Emergency shutdown system
• Mandatory pre-bid meeting and site visit
• Mandatory background checks for personnel working on the project
• Compliance with Central Utah Correctional Facility Rules and Regulations