The Mobile Health Renovation project involves a full‑scope general‑contractor renovation of the existing Wayne State University “Mobile Health” office building. The work includes demolition, new metal‑stud partitions, upgraded HVAC, electrical, low‑voltage systems, new lighting, fire‑alarm integration, and interior finishes such as luxury vinyl tile flooring and millwork. The contract follows a lump‑sum “General Contractor” format, requires compliance with the WSU wage‑rate schedule, and imposes liquidated damages of $500 per day for delays beyond the September 26 2025 substantial‑completion deadline. Key points:
• Mandatory pre‑bid conference (23 Apr 2025) and electronic bid submission deadline (13 May 2025).
• Awarded to Decima LLC; all bidders must post prevailing‑wage tables on‑site and submit certified payroll.
• Contract includes three optional alternates (electrical panel, additional charging pedestals, single‑phase construction option) and strict change‑order markup limits (10 % subcontractor, 7.5 % self‑performed).