This contract calls for the full rehabilitation of the sanitary sewer system along Bloomfield Avenue (State Highway Route 305) and Marshall Phelps Road in the Town of Windsor, CT. The scope includes installation of a UV‑cured-in‑place‑pipe (CIPP) liner throughout the existing pipe, covering all labor, equipment, permits, and related costs. Bidders were required to submit a 10 % bid security, possess a valid DAS Contractor Pre‑qualification Certificate for “Sewer and Water Lines,” and attend a mandatory pre‑bid conference on September 1 2017. The project is overseen by The Metropolitan District, with all bid documents obtainable via the agency’s e‑procurement portal or by appointment at the District Clerk’s office.
• Install UV‑CIPP liner in existing sanitary sewer along Bloomfield Avenue and Marshall Phelps Road.
• Mandatory pre‑bid conference and DAS pre‑qualification requirements for both primary contractor and any subcontractor with a $500 K+ scope.
• Bid security set at 10 % of the total bid; sealed bids due September 21 2017, award issued January 9 2018.
Attached files
The award documents live at the source — open the contract source above to download them.