This contract involves the resurfacing of an aggregate road for approximately 1.01 miles, including a 6” aggregate lift with ditches installed at specified locations, and the installation of 5 drainage wells with appropriate drainage. The project is located on a road leading to East Fork Fire Salvage. The contractor is required to furnish the material for the road lift, while the material for the drainage wells will be government-furnished. The contract was awarded to Red Oak Construction LLC.
• The project requires the resurfacing of an aggregate road.
• The road will need a 6” aggregate lift with ditches installed at specified locations.
• The project involves the installation of 5 drainage wells with appropriate drainage.
• The contractor is required to furnish the material for the road lift.
• The material for the drainage wells will be government-furnished.
• The contract was awarded to Red Oak Construction LLC.