This contract is for lead abatement work at 958 Packard Drive, Akron, Ohio. The work includes exterior and interior repairs, replacement of doors and windows, and painting. The contractor must follow all applicable local building codes and regulations, including OSHA and HUD regulations. The contract was awarded to ALEXANDER'S HOME IMPROVEMENTS for a total of $13,585.00. Some key points of the contract include:
* The contractor must attend a mandatory pre-bid meeting to submit a bid.
* The contractor must have a current registration, bond, and insurance on file with the appropriate jurisdiction's building department.
* The contractor must carry a minimum of $2,000,000 of General Commercial Liability Insurance and $1,000,000 of Commercial Auto Liability.
* The contractor must list the county of Summit as an additional insured on their insurance policy.
* The contractor must do all work in accordance with all applicable local building codes and regulations, including OSHA, City, County, and state codes, and the Ohio Department of Development Residential Rehab Standards.
Some of the specific work items included in the contract are:
* Exterior door casing on side A wrap with coil stock and caulk all seams.
* Front porch support posts wrap with white coil stock and caulk all seams.
* All exterior window casings, including basement windows, wrap with white coils stock and caulk all seams.
* Garage door casings on side A and side B wrap casings with white coil stock and caulk all seams.
* Garage, all sides, enclose eaves with vented soffit, add fascia board as needed.
* Garage man door, side B, replace with steel pre-primed, prehung door with weather stripping and dead bolt all components.
* Basement stairway side A interior door eliminate friction point.
* Bathroom #1 window casing and sill, side B, paint stabilize in accordance with HUD regulations.
* Bathroom #1 Side D interior door, door jamb, and stop, eliminate friction and impact surfaces while maintaining the integrity of the door.
The contract also includes a list of documents that the contractor must accept, including the packard lira.pdf, INSTRUCTIONS TO BIDDERS_Community and Economic Development.pdf, Successful Construction Bidder Requirements_Development.pdf, and Prevailing Wage.pdf.