The contract is for the replacement of a digital sign at Hummer Sports Park. The scope of work includes the purchase and installation of an outdoor electronic message center with 2 one-sided displays. The contract was awarded to Colorado Time Systems with a total awarded bid of $22,495.00. The key features of the contract include the removal, delivery, and installation of the new sign, as well as training for the new system. Some of the key points to consider when evaluating the similarity of this contract to other business specialties include the type of sign being replaced, the scope of work, and the award criteria.
• The contract is for a specific type of sign, which is an outdoor electronic message center with 2 one-sided displays.
• The scope of work includes the purchase and installation of the new sign, as well as removal, delivery, and training.
• The award criteria are based on the lowest responsive and responsible bid.
• The contract was awarded to a single vendor, Colorado Time Systems.
• The total awarded bid is $22,495.00.