The City & Borough of Juneau is seeking a consultant to provide design services for the rehabilitation of downtown stairs. The scope of work includes preparing complete, bid-ready construction drawings, specifications, bid schedule, engineer's estimate for construction, neighborhood outreach, and coordination assistance for the removal and replacement of staircases. The consultant will also need to provide documented correspondence from long lead time and/or specialty items that could impact schedule and cost. The project will involve coordination with various city departments, including the Street Division, Wastewater Division, and Water Division.
• The project includes the rehabilitation of several stairways, including those on Boroff Way, Decker Way, and Upper section of Rawn Way.
• The consultant will need to provide project estimates at 65%, 95%, and final, bid-ready documents.
• A pre-bid conference was held on July 27, 2023, via teleconference.
• The contract was awarded to Northwind Architects, LLC, who submitted the only proposal for the project.