The Walnut Grove Pump Station Abandonment Project involves the furnishing of labor, materials, tools, and equipment for the abandonment of the Walnut Grove Pump Station. The work includes the removal of equipment, piping, structures, paving, and fencing, as well as the installation of new gravity sewer mains and manholes. The estimated construction cost is $850,000. The project requires a Class A - General Engineering Contractor license.
• The project involves the abandonment of the Walnut Grove Pump Station S064.
• The work includes the removal of equipment, piping, structures, paving, and fencing.
• The project requires the installation of new gravity sewer mains and manholes.
• The estimated construction cost is $850,000.
• The project requires a Class A - General Engineering Contractor license.