The Laurel Street Water Main Installation Project involves the installation of approximately 550 feet of 12-inch fused C-900 PVC DR 14 water main on Laurel Street from Riordan Lane to Griggs Lane. The project also includes the installation of approximately 300 feet of fused 8-inch C-900 PVC DR 14 water main to replace an existing 4" and 6" cast iron water main with the reconnection of 6 services. Additionally, the project involves the installation of a 36-inch bypass valve assembly on the existing 36" asbestos cement transmission main and the installation of 220 feet of 36-inch AWWA C200 steel cement lined and coated (CMLC) transmission main. The project requires the contractor to provide labor, equipment, materials, and services necessary to complete the work. The bid tabulation matrix lists the prices submitted by several companies for each item of work.