The contract is for the rehabilitation of the Salinas pipeline, which involves investigating and repairing defective pipeline segments along a 1.25-mile reach between the Salinas Booster Station and the Cuesta Tunnel. The engineer's estimate for the project is $251,000. The contract was awarded to two vendors, Rob Reynolds Construction, Inc. and V. Lopez Jr. & Sons Gen. Eng. Contractors, Inc. The contract includes various items, such as mobilization/demobilization, traffic control system, portable changeable message sign, construction area signs, sheeting, shoring, and bracing, remove and replace existing pipe, site restoration, and allowances for additional sheeting, shoring, and bracing, and supplemental traffic control.
• The contract is for a specific project, Salinas Pressure Pipeline Repairs – Project 1.
• The project involves rehabilitation of a pipeline.
• The engineer's estimate for the project is $251,000.
• The contract was awarded to two vendors.
• The contract includes various items, such as mobilization/demobilization, traffic control system, and site restoration.