Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Salinas Pressure Pipeline Repairs, Proj 1

Awarded contract·County of San Luis Obispo·California

Salinas Pressure Pipeline Repairs, Proj 1

Won by Rob Reynolds Construction, Inc. +1 more$398kMultiple Award
Contract source

Awarded vendors

  • Rob Reynolds Construction, Inc.
  • V. Lopez Jr. & Sons Gen. Eng. Contractors, Inc.

Description

The contract is for the rehabilitation of the Salinas pipeline, which involves investigating and repairing defective pipeline segments along a 1.25-mile reach between the Salinas Booster Station and the Cuesta Tunnel. The engineer's estimate for the project is $251,000. The contract was awarded to two vendors, Rob Reynolds Construction, Inc. and V. Lopez Jr. & Sons Gen. Eng. Contractors, Inc. The contract includes various items, such as mobilization/demobilization, traffic control system, portable changeable message sign, construction area signs, sheeting, shoring, and bracing, remove and replace existing pipe, site restoration, and allowances for additional sheeting, shoring, and bracing, and supplemental traffic control. • The contract is for a specific project, Salinas Pressure Pipeline Repairs – Project 1. • The project involves rehabilitation of a pipeline. • The engineer's estimate for the project is $251,000. • The contract was awarded to two vendors. • The contract includes various items, such as mobilization/demobilization, traffic control system, and site restoration.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
310009

Contract value

$398,000

The contract value can be estimated based on the engineer's estimate, which is $251,000. However, the actual contract value may be different, as the bid results show that the total base bid for the two vendors is $346,948.33 and $448,956.76, respectively. Therefore, the estimated contract value is between $346,948.33 and $448,956.76.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Salina·Kansas

Top match · 69%

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Chula Vista·California

68% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Redlands·California

68% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Salina·Kansas

68% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

68% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

U.S. Department Of Defense·California

68% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

Santa Clara Valley Water District·California

68% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

City of Sanibel·Florida

67% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

67% match

29--VALVE,RELIEF,FUEL, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Defense·New Hampshire

67% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

67% match

VALVE,RELIEF,PRESSU

Closes 11/16/2026Opened 10/19/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

City of Shawnee·Kansas

66% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Carlsbad·California

66% match

Vista/Carlsbad Reach VC-2 Manhole Rehabilitation Project

Closes 11/2/2026Opened 10/21/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

66% match

CONSUMABLES PIPE WRAP THREAD SEALANT MATERIAL DROP PIPE REPAIR

Closes 11/9/2026Opened 10/28/2026

City of San Bernardino·California

66% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Rancho Palos Verdes·California

66% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

San Francisco Water Power Sewer·California

66% match

WD-2914 Bay Division Pipelines Nos. 1 Through 4 Lining and As-Needed Pipeline Repairs

Closes 11/19/2026Opened 10/8/2026

Nevada Department of Human Services·Nevada

66% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

The Metropolitan Water District of Southern California·California

66% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

Santa Clara Valley Water District·California

66% match

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

Department of Public Safety (State of Alaska)·Alaska

66% match

Sitka Training Academy Sewerline Repair

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Defense·Pennsylvania

66% match

CYLINDER,PNEUMATIC,

Closes 12/14/2026Opened 9/15/2026