The 2019 Lane Line Painting contract involves the annual city-wide lane line repainting project, including spring repainting of existing lane, edge, and center lines on all City streets and fall repainting with a second coat on busiest arterial and collector roadways. The contract was awarded to Dakota Barricade with a base bid amount of $113,600.00. The project has an engineer's estimate of $107,000.00 and an advertising authority of $110,000.00. Key aspects of the contract include:
• Annual city-wide lane line repainting project
• Spring repainting of existing lane, edge, and center lines on all City streets
• Fall repainting with a second coat on busiest arterial and collector roadways
• Contract awarded to Dakota Barricade
• Base bid amount: $113,600.00
• Engineer's estimate: $107,000.00
• Advertising authority: $110,000.00