The County of Santa Barbara Purchasing Division invited the submission of proposals for the design, procurement, installation, testing, and commissioning of a minimum of 360kWh (three hundred sixty) 90Kw (ninety) capacity Battery Energy Storage System (BESS). The bid opening summary lists two bidders, Endelos Energy, Inc. and Swell Energy, Inc., whose bids are currently in review. Key aspects of the contract include:
• The BESS must have a minimum capacity of 360kWh and 90Kw.
• The contract involves design, procurement, installation, testing, and commissioning of the BESS.
• The bid submission date was January 13, 2021, at 5:00:00 PM EST.
• The bid opening date was January 13, 2021, at 2:00:00 PM PST.