The Caperton Siphon Drain Repair project involves the construction and completion of new 12” drain piping, precast utility vault, manufactured 32” mortar lined and coated steel tee, concrete slab with davit sleeve, and AC paving. The project has a contract time of 240 calendar days and an estimated cost of $289,000. The contract was awarded to Swierstok Enterprise, Inc., dba Pro Builders, and Lorang Brothers Construction, Inc. The scope of work includes mobilization/demobilization, worker protection and trench safety/shoring, installation of 12” drain piping, utility vault, and concrete slab, among other tasks.
• The project requires the furnishing of all labor, materials, tax, equipment, and services for the construction and completion of the project.
• The contract has a total of 15 items, including mobilization/demobilization, worker protection and trench safety/shoring, and installation of 12” drain piping.
• The contract also includes a comparison of the bids submitted by the two vendors, with the total bid price for Swierstok Enterprise, Inc., dba Pro Builders, being $446,190.00, and for Lorang Brothers Construction, Inc., being $491,000.00.