The contract is for the Striker Well (W100) Paving and Fence Installation project, which includes the removal of existing sidewalk and gutter, excavation of native soil, and installation of new wrought iron fence and gate. The project is located at the Sacramento County Water Agency's Striker Well (W-100) Site. The contract was awarded to Roebbelen Contracting, Inc. for a total base bid price of $123,514.
• The project involves the removal of existing fence and the installation of new wrought iron fence and gate.
• The project includes the excavation of native soil and the installation of new sub-base and asphalt concrete.
• The contract was awarded through a competitive bidding process, with a total of five bidders submitting proposals.
• The contract is subject to the terms and conditions outlined in the bid documents, including the plans and specifications.
• The contractor is required to provide a bid guaranty, which must be a bidder's bond, a certified check, or a cashier's check payable to the Treasurer of Sacramento County.