Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Civil Engineering
  5. ›Town of Sandisfield, Dodd Road Culvert Replacement over…

Massachusetts Town of Sandisfield·Massachusetts

Town of Sandisfield, Dodd Road Culvert Replacement over Unnamed Stream

Closes 5/13/2026$350k – $1.7MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Sandisfield is seeking bids for the replacement of two existing 18" HDPE culvert pipes with a precast concrete box culvert. The project involves removing the existing pipes, maintaining streamflow through temporary diversion or bypass pumping, and removing and disposing of stone headwalls on both ends of the culvert. Bids shall be on a lump sum basis as indicated in the Bid Form. Bidding Documents may be obtained electronically from the Tighe & Bond website. • The project requires the removal of two existing 18" HDPE culvert pipes and replacement with a precast concrete box culvert. • The project involves maintaining streamflow through temporary diversion or bypass pumping. • The project requires the removal and disposal of stone headwalls on both ends of the culvert. • Bids shall be on a lump sum basis as indicated in the Bid Form. • Bidding Documents may be obtained electronically from the Tighe & Bond website.

Attached files

Contact

Janey Beardsley(Purchaser)

[email protected]

(413) 258-4711 Ext. 3

Key dates

Opened
4/23/2026
Closes
5/13/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237010
Solicitation №
BD-26-1666-TSTH-TSTH-128543

Budget estimate

$350,000 – $1,700,000

The budget for this project can be estimated based on the scope of work and industry standards. The replacement of two existing 18" HDPE culvert pipes with a precast concrete box culvert, along with the maintenance of streamflow and removal of stone headwalls, is a significant project that requires specialized equipment and labor. The cost of materials, including the precast concrete box culvert, temporary diversion or bypass pumping equipment, and stone headwalls, can range from $100,000 to $500,000. The cost of labor, including the cost of skilled workers, equipment operators, and engineers, can range from $200,000 to $1,000,000. Other costs, including permits, inspections, and contingency funds, can add an additional $50,000 to $200,000 to the total cost. Based on these estimates, the total budget for this project can range from $350,000 to $1,700,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Spartanburg County Government·South Carolina

Top match · 71%

Walnut Church Hill Road Culvert Replacement

Closes 11/10/2026Opened 10/7/2026

City of Charlotte·North Carolina

71% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Spartanburg County Government·South Carolina

70% match

RFP# 2027024 SPARTANBURG COUNTY DAVIS ROAD CULVERT REPLACEMENT PROJECT

Closes 11/10/2026Opened 10/1/2026

Clermont County - Board of Commissioners·Ohio

69% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Snohomish County·Washington

68% match

Stanwood/Marine Drive Culvert Replacement

Closes 11/10/2026Opened 10/7/2026

NYS Cambria, Town of·New York

68% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

NYS Phelps, Town of·New York

68% match

Culvert Replacement Project Melvin Hill Road over Tributary to Canandaigua Outlet

Closes 11/10/2026Opened 10/20/2026

NYS Washington, Town of·New York

68% match

Oak Summit Road Over Sprout Creek Culvert Replacement

Closes 11/17/2026Opened 10/19/2026

Snohomish County·Washington

68% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

Nevada Government·Nevada

68% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Park County Public Works·Wyoming

68% match

Willwood Road Improvements Project- Phase 2 Culverts

Closes 11/16/2026Opened 10/16/2026

Board of Commissioners of the County of Allen·Indiana

67% match

Knouse Road Culvert Replacement

Closes 11/10/2026Opened 10/21/2026

City of Charlotte·North Carolina

67% match

718 Harwyn Dr. Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

Connecticut Town of Wethersfield·Connecticut

67% match

IMPROVEMENTS TO COPPERMILL RD CULVERT ALONG GOFF BROOK

Closes 11/6/2026Opened 10/9/2026

City of Charlotte·North Carolina

67% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

Massachusetts City of Gardner·Massachusetts

67% match

2027-011 Keyes Road Culvert Replacement

Closes 11/5/2026Opened 10/7/2026

City of Charlotte·North Carolina

67% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Charlotte·North Carolina

67% match

Moorland Dr 3831 Storm Drainage Improvement Project

Closes 1/1/2027Opened 5/13/2026

Clark County·Nevada

67% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

Georgia Gwinnett County·Georgia

66% match

BL131-26, Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Georgia City of Covington·Georgia

66% match

2026-27 Three Ring Access Road Culvert Improvements

Closes 12/1/2026Opened 10/26/2026

Massachusetts Town of Dedham·Massachusetts

66% match

20270004 - Maverick St. Over Mother Brook Culvert Rehab

Closes 11/16/2026Opened 10/14/2026

Catawba Regional Council of Governments·South Carolina

66% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Town of South Hill·Virginia

66% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

66% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027