Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Wheatland Regional Sewer Pipeline Project

City of Wheatland·California

Wheatland Regional Sewer Pipeline Project

Closes 8/25/2026$2.5M – $5.2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Wheatland is soliciting sealed bids for the design‑build construction of a 7.7‑mile regional sewer force‑main, two new pump stations, associated horizontal directional drilling, demolition, culvert replacement, site restoration, testing, and start‑up. The scope includes all labor, materials, equipment, and incidentals required to deliver a complete, operational pipeline system. Bidders must attend a mandatory pre‑bid conference on July 30, 2026 and complete a mandatory self‑guided site walk‑through on the same day. The bid opening is scheduled for August 25, 2026 at City Hall. The estimated total project cost is roughly $52 million (pipeline $19 M, pump stations $33 M). • 7.7‑mile 12‑ to 18‑inch HDPE sewer force‑main • Two pump stations (separate contract but coordinated) • Horizontal directional drilling and jack‑and‑bore operations • Demolition/replacement of existing pump station and culverts • Electrical controls, site restoration, testing, and commissioning • Mandatory pre‑bid meeting (July 30) and site inspection (July 30) • Bid submission deadline August 25, 2026

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Dane Schilling(Bid Contact)

[email protected]

(530) 888-9929

Key dates

Opened
7/17/2026
Questions due
8/11/2026
Pre-bid meeting
7/30/2026Mandatory
Site visit
7/30/2026Mandatory
Closes
8/25/2026
Duration
365 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
CWSRF Project No C-06-8753-110

Budget estimate

$2,500,000 – $5,200,000

The bid documents list a total estimated construction cost of about $52 million ($19 M for the pipeline and $33 M for pump stations). Assuming the contractor’s profit margin and overhead range from 5 % to 10 % of the contract value, the expected earnings for the winning bidder would likely fall between roughly $2.5 million and $5.2 million. Factors influencing the final budget include the exact scope of work awarded (pipeline only vs. combined with pump stations), change‑order volume, and the contractor’s efficiency in managing labor and material costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Marysville, Ohio·Ohio

Top match · 68%

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Mansfield·Texas

68% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

City of Redlands·California

68% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Ann Arbor·Michigan

68% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

City of Rapid City·South Dakota

67% match

Lacrosse Street Sanitary Sewer Reconstruction

Closes 11/17/2026Opened 10/29/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Tarrant Regional Water District·Texas

67% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

D.R. Horton - Texas, Ltd. On Behalf of Montgomery County MUD No. 202A·Texas

67% match

Water, Sanitary Sewer, and Drainage Facilities, and Alternate Paving and Appurtenances To Serve Silverthorne Section 10

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·Missouri

67% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Lynchburg·Virginia

66% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Town of Chase City·Virginia

66% match

Sanitary Sewer Rehabilitation

Closes 12/9/2026Opened 10/29/2026

City of West Des Moines·Iowa

66% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Connecticut Town of Fairfield·Connecticut

66% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Hastings Utilities·Nebraska

66% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Brazos Valley·Texas

66% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Brazos Valley·Texas

66% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Maryland Wicomico County Government·Maryland

66% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/14/2026

Catawba Regional Council of Governments·South Carolina

66% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Douglas·Wyoming

66% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Fort Bend County Municipal Utility District No. 134A·Texas

66% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

Wicomico County·Maryland

66% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/13/2026

City of Charlotte·North Carolina

65% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

65% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Chula Vista·California

65% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Elgin·Illinois

65% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026