Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Construction
  5. ›2026-146 KMA Airport Perimeter Fence & Gate Improvements

City of Kenai, AK Public Works Department·Alaska

2026-146 KMA Airport Perimeter Fence & Gate Improvements

Closes 7/23/2026$100k – $300kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Kenai is soliciting bids to replace and upgrade the perimeter security system at Kenai Municipal Airport. The work includes removal of existing chain‑link fence, installation of new 6‑ft chain‑link fencing and fence skirt, construction of multiple vehicle gates (double swing and single cantilever of varying widths) with electronic operators, and installation of four pedestrian key‑less lock gates. The contractor will also perform site preparation, clearing, utility coordination, erosion‑control, and associated civil and electrical work, while complying with FAA, OSHA, and Alaska state regulations. • Replace ~6,300 LF of chain‑link fence and 6,800 LF of fence skirt. • Install 3 double‑swing gates, 1 single cantilever 22‑ft gate, 6 single cantilever 30‑31‑ft gates, 2 single cantilever 36‑ft gates, and 9 power‑gate operator systems. • Provide all associated foundations, demolition, mobilization, environmental controls, and required documentation (e.g., tax‑compliance certificate, non‑collusion affidavit, bid bond, performance/pay bonds, insurance, DBE reports). • Complete work by Substantial Completion (30 Sept 2027) and Final Acceptance (31 Oct 2027) with liquidated damages for delays. • No ground‑disturbing work (paving/electrical) allowed before 1 May 2027; 45‑day notice required for any impact to airport operations.

Attached files

Key dates

Opened
6/24/2026
Questions due
7/16/2026
Pre-bid meeting
7/7/2026
Closes
7/23/2026
Duration
15 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
2026-146 KMA Airport Perimeter Fence & Gate Improvements

Budget estimate

$100,000 – $300,000

The solicitation lists an estimated construction cost of $2 M to $3 M. Assuming the contractor’s profit margin of roughly 5‑10% and accounting for cost‑plus labor, equipment, and overhead, the net earnings for the prime contractor are likely to fall between $100,000 and $300,000. The range reflects variability in subcontractor bids, material prices, and potential change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Commerce·North Carolina

Top match · 73%

Security Fence and Gate Replacement

Closes 11/12/2026Opened 10/28/2026

Port of Fernandina·Florida

69% match

RFP Terminal Perimeter Fencing Replacement

Closes 11/18/2026Opened 10/19/2026

Delaware Coastal Airport·Delaware

68% match

COMING SOON - Georgetown, DE - Delaware Coastal Airport - Construct Taxiway B - Bid Pkg. 3 (25031)

Rolling / TBD closeOpened 10/22/2026

City of Lynchburg·Virginia

68% match

IFB 2027-029 TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

California Military Department·California

68% match

IFB 133887 Airfield South Perimeter Fence Replacement

Closes 11/24/2026Opened 10/27/2026

State of Hawaii Department of Transportation, Airports·Hawaii

67% match

CO1549-33 LOBBIES 4 AND 5 IMPROVEMENTS

Closes 11/19/2026Opened 9/24/2026

Delta Airport Consultants·Virginia

67% match

COMING SOON - Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 (20030)

Rolling / TBD closeOpened 5/1/2026

City of Mankato·Kansas

67% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Delta Airport Consultants·Virginia

66% match

COMING SOON - Roanoke, VA - Roanoke-Blacksburg Reg. Airport - Rehabilitate Runway 6-24 (24072)

Rolling / TBD closeOpened 5/1/2026

Niagara Frontier Transit Authority (NFTA)·New York

66% match

12NA2603 - NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/6/2026

NYS Niagara Frontier Transportation Authority·New York

66% match

NFIA – Taxiway J East Approach Removal

Closes 11/17/2026Opened 10/5/2026

City of Lynchburg·Virginia

66% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

Raleigh Durham Airport Authority·North Carolina

66% match

Taxiway F Pavement Repairs - 2026

Closes 11/9/2026Opened 10/8/2026

City of Prescott·Arizona

66% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

Pulaski County·Arkansas

66% match

Airport Park Improvements

Closes 11/9/2026Opened 10/26/2026

Port of Portland·Oregon

65% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

City of Chicago·Illinois

65% match

Airside and Landside Concrete and Maintenance for O’ Hare and Midway International Airports

Closes 11/18/2026Opened 10/13/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

Provide Guard Tower & Lower Perimeter Fence Modifications

Closes 11/18/2026Opened 9/23/2026

CHA Consulting, Inc.·Indiana

65% match

EVANSVILLE-VANDERBURGH AIRPORT AUTHORITY DISTRICT REGIONAL AIRPORT – FLIGHTLINE DRIVE UTILITY EXTENSION

Closes 12/2/2026Opened 10/29/2026

Raleigh Durham Airport Authority·North Carolina

65% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

Texas Department of Transportation·Texas

65% match

Fencing and Security Upgrades, Multiple Locations, Abilene District

Closes 12/1/2026Opened 10/15/2026

Memphis-Shelby Airport Authority·Tennessee

65% match

DeWitt Spain Exterior Improvements

Closes 11/23/2026Opened 10/6/2026

City of Charlotte·North Carolina

65% match

Airport Traffic and Curb Support Services

Rolling / TBD closeOpened 5/15/2026

City of Boise·Idaho

65% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

City of Fayetteville·Arkansas

65% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026