The City of Ann Arbor is soliciting bids for the reconstruction of the taxilane and apron serving the Box Hangar area at the Ann Arbor Municipal Airport. The work includes demolition of existing pavement, sub‑grade preparation, hot‑mix asphalt placement, concrete repairs, turf grading, storm‑drain protection, erosion‑control measures, utility protection, and extensive traffic‑control/airport safety phasing. The contract is a short‑duration, high‑intensity airfield paving project with a 14‑day performance window (7 days for the primary work area, 2 days for a secondary area) and a mandatory prevailing‑wage and living‑wage compliance regime. Bidders must provide a 5 % bid security, adhere to MDOT‑Aero classification “Cb – Hot‑Mix Asphalt/Bituminous Paving”, and submit all required wage, insurance, and bonding documentation.
• Scope: demolition, base work, asphalt paving, concrete repairs, turf restoration, storm‑drain inlet protection, silt‑fence/erosion control, utility protection, airport traffic‑control barriers.
• Schedule: questions due 12/29/2025, bid due 1/12/2026, contract performance 14 calendar days after notice to proceed; anticipated construction start late spring/summer 2026.
• Requirements: 5 % bid bond, performance & labor/material bonds for full bid amount, prevailing‑wage & living‑wage declarations, workers’ comp & commercial general liability insurance, MDOT‑Aero forms, compliance with FAA/airport safety standards.