Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›RFQ for DB-140 Southeast Water Pollution Control Plant…

San Francisco Water Power Sewer·California

RFQ for DB-140 Southeast Water Pollution Control Plant – Secondary Clarifiers Rehabilitation

Closes 11/12/2025
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The San Francisco Public Utilities Commission (SFPUC) is issuing this Request for Qualifications (RFQ) in search of Applicants with the specified qualifications to respond to the forthcoming Request for Proposals (RFP) to design and construct the DB-140 Southeast Water Pollution Control Plant – Secondary Clarifiers Rehabilitation project (Project). An “Applicant” is any entity responding to this RFQ.Built in 1952, the Southeast Water Pollution Control Plant (SEP) is the City’s largest wastewater treatment facility, handling nearly 80% of San Francisco's combined stormwater and wastewater every year. The purpose of the SEP secondary clarifiers (SEP 230) is to separate the activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities. The sedimentation tanks consist of sixteen reinforced concrete circular tanks which are divided into two groups of eight, designated as the North and South clarifiers by their relative position on the plant site. Equipment included in SEP 230 includes diffusers to mix the flow in the mixed liquor channels, gates and valves to control flow and sludge/scum collection equipment in the clarifiers. A condition assessment study of SEP was implemented between 2012 and 2013, which identified structural deficiencies and needs for equipment replacement. The SEP condition assessment identified that structural rehabilitation of the clarifiers is needed. The clarifiers were found to be corroded and failure of existing clarifier related components had contributed to numerous and repeated temporary repairs and extended clarifier downtime. Through the CWWSIPSE04/WW-626 Primary & Secondary Clarifier Upgrades Project, SFPUC completed concrete spall repair, secondary clarifier mechanism replacement, and clarifier concrete coating for eight of the sixteen tanks as part of a phased implementation approach. To meet Operational Reliability (State of Good Repair) level of service goals, this project addresses rehabilitation works for the remaining eight tanks.The SFPUC strongly encourages all Applicants to attend the RFQ Pre-Submittal Conference on Wednesday, October 15, 2025, at 10:00 AM. https://sfwater.zoom.us/j/86538047049?pwd=1gm26hz82jCWM3uEp1uEHFAiIboyOM.1All requests for information concerning the RFQ must be directed to [email protected] no later than the Deadline for Applicants to Submit RFQ Questions.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
9/29/2025
Closes
11/12/2025

Last updated

Details

Industry
Civil Engineering
NAICS
221320

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Santa Rosa·California

Top match · 73%

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

Chittenden County Regional Planning Commission·Vermont

73% match

Ongoing Call: RFQ TO MUNICIPALITIES & ORGANIZATIONS TO SERVE AS WATER QUALITY IMPROV

Closes 12/31/2026Opened 7/18/2022

Connecticut Town of Stafford·Connecticut

72% match

RFQ: On-Call Engineering Services for Wastewater-Related Needs

Closes 11/17/2026Opened 10/28/2026

Texas West Travis County Public Utility Agency·Texas

71% match

RFQ - Raw Water Wet Well Cleaning

Closes 11/3/2026Opened 10/20/2026

Tarrant Regional Water District·Texas

71% match

RFSOQ for Electrical Support

Closes 11/19/2026Opened 10/12/2026

Johnson County Wastewater·Kansas

71% match

Public Notice: Request for Qualifications (RFQ) No. 2026-043

Rolling / TBD closeOpened 11/12/2026

County of El Dorado·California

71% match

RFQ - Property Abatement Services

Closes 11/13/2026Opened 10/21/2026

City of Bakersfield·California

71% match

RFQ - Consulting Services for Water Well CBK-81 Construction and L-211 TCP & H2S Treatment

Closes 11/3/2026Opened 10/13/2026

City of Binghamton·New York

71% match

RFQ: Preparation of a Lead Service Line Inventory and Lead Service Line Replacement Plan for City of Binghamton Water System

Closes 11/4/2026Opened 10/9/2026

City of Stillwater·Oklahoma

71% match

Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation

Closes 11/11/2026Opened 10/10/2026

Connecticut Town of Old Saybrook·Connecticut

71% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

New York City Department of Environmental Protection·New York

70% match

82627B0004-BEDC OB-144A: Total Residual Chlorine (TRC) Optimization at the Oakwood Beach Wastewater Resource Recovery Facility (WRRF)

Closes 11/18/2026Opened 10/7/2026

North Carolina Cape Fear Public Utility Authority·North Carolina

70% match

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/8/2026

Massachusetts Town of Hull·Massachusetts

70% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

City of Hollywood·Florida

70% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

70% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Lorain County·Ohio

70% match

RFQ - Design and Engineering Services

Closes 11/6/2026Opened 10/6/2026

City of Newport News·Virginia

70% match

Replacement of Submersible Level Transducers

Closes 11/5/2026Opened 10/9/2026

Little Rock Water Reclamation Authority·Arkansas

70% match

SIDESTREAM TREATMENT IMPROVEMENTS – Little Rock Water Reclamation Authority RFQ

Closes 11/10/2026Opened 10/11/2026

Upper Occoquan Service Authority·Virginia

70% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

New York City Department of Environmental Protection·New York

70% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Oregon Clackamas County·Oregon

70% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

San Francisco Water Power Sewer·California

70% match

RFQ for HH-1018 Moccasin Powerhouse Bypass Upgrade

Closes 11/19/2026Opened 9/23/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

70% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

The City of Columbus·Ohio

70% match

RFQ033860 - Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026