Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nebraska guideNebraska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nebraska
  4. ›Construction
  5. ›WEC 1 Bottom Ash Hopper Water Recirc System Construction…

City of Hastings·Nebraska

WEC 1 Bottom Ash Hopper Water Recirc System Construction HU 2026-15

Closes 2/18/2026$800k – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Hastings is seeking a qualified contractor to demolish existing piping, relocate an air‑water reservoir, and install a new bottom‑ash hopper water recirculation system at the Whelan Energy Center Unit 1. The scope includes installing B&W‑supplied overflow tank, pumps, associated piping, valves, instrumentation, insulation, protective coatings, and providing full hydro‑testing, NDE, and start‑up support through commissioning. The work must be completed within the plant’s Spring outage window and finished by early May 2026. • Demolition of existing pipe and abandonment of current ash‑water pumps. • Relocation of Air/Water Reservoir 1B and installation of overflow tank, pumps, pipe supports, instrumentation, and insulation. • Field welding, coating, hydro‑testing, pneumatic testing, and start‑up/commissioning support. • Coordination with parallel electrical (HU 2026‑16) and PLC (HU 2025‑146) contracts; strict adherence to the March 20 – April 17 outage schedule.

Attached files

Contact

Brandon Miller(Mechanical Engineer)

[email protected]

(402) 462-3653

Key dates

Opened
1/21/2026
Closes
2/18/2026
Projected award
2/23/2026
Duration
3 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
HU 2026-15

Budget estimate

$800,000 – $2,500,000

No contract value is disclosed, but comparable industrial‑plant mechanical retrofits typically range from $1 M to $2.5 M depending on equipment size, piping length, coating scope, and testing requirements. This estimate assumes a mid‑size pump/tank package, extensive pipe supports, full hydro‑testing, and a three‑month labor window with skilled welders, riggers, and commissioning staff.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Pennsylvania

Top match · 68%

3389 Large Class Hopper Dredge (LCHD-ESS)

Closes 3/15/2027Opened 7/16/2026

Oregon Clackamas County·Oregon

67% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

New York City Department of Environmental Protection·New York

66% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

New York City Department of Environmental Protection·New York

66% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

U.S. Department Of The Interior·California

66% match

FWS - Pixley NWR Water Recirculation Design-Build

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Health And Human Services·Arizona

66% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

New York City Department of Environmental Protection·New York

66% match

82625B0045-BWT-BB-236 Replacement of the Cyclone Degritters and Grit Washers at the Bowery Bay WWTP

Closes 11/12/2026Opened 9/28/2026

New York City Department of Environmental Protection·New York

66% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

U.S. Department Of Defense·Missouri

65% match

Debris Boom Supply and Install at Harry S. Truman Lake Project

Closes 11/2/2026Opened 9/28/2026

City of Bellevue·Washington

65% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·Pennsylvania

65% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

West Chester Township·Ohio

65% match

2026 Fall Storm Water Pipe Replacement Bid - West Chester Ohio

Closes 11/5/2026Opened 10/14/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

City of Kyle·Texas

65% match

Yarrington Water Treatment Plant Disinfection Modification

Closes 12/1/2026Opened 10/26/2026

Massachusetts Town of Hull·Massachusetts

65% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 2-2026 (OM26002)

Closes 5/7/2028Opened 4/15/2026

Oregon City of Ashland·Oregon

65% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of San Clemente·California

65% match

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

65% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Eastern Municipal Water District·California

64% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

U.S. Department Of Defense·Mississippi

64% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Defense·Connecticut

64% match

Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT

Closes 11/5/2026Opened 10/13/2026

City of Cortez·Colorado

64% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

64% match

FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING

Closes 11/2/2026Opened 8/31/2026