Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Engineering Services
  5. ›Santa Fe County Water Reclamation Facility (SFCWRF)…

Santa Fe County·New Mexico

Santa Fe County Water Reclamation Facility (SFCWRF) Monitoring‑Well Development and Rancho Viejo Aquifer Recovery and Storage

Closes 3/9/2026$1M – $3MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County seeks an engineering firm to provide full‑service design, permitting, construction observation, and close‑out for new and modified groundwater monitoring wells at the Santa Fe County Water Reclamation Facility and to support a Rancho Viejo aquifer storage‑recovery (ASR) project. The work includes study/report phases, preliminary and final design, bidding assistance, on‑site construction observation, warranty inspection, and extensive regulatory reporting to NMED‑GWB and the State Engineer. Deliverables span design drawings, cost estimates, construction documents, well‑installation reports, groundwater‑quality monitoring plans, and final “as‑built” records. • Engineering design of Monitoring Well 5, raise MW‑4, and locate an additional downstream well. • Design and construction oversight for conversion of two de‑commissioned impoundments to infiltration basins and a production well for ASR at Rancho Viejo (≈550 AF/yr capacity). • Preparation of permit amendments (Ground‑Water Discharge, UIC, NMOSE USR) and submission of all required regulatory documentation. • Construction‑phase observation, payment certification, change‑order review, and an 11‑month post‑construction warranty inspection.

Attached files

Contact

Dani Koussa(Senior Procurement Specialist)

[email protected]

(505) 986-6344

Key dates

Opened
6/2/2024
Questions due
6/18/2024
Pre-bid meeting
7/3/2024
Closes
3/9/2026
Duration
4 years

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP No. 2024‑0176‑PW/MB

Budget estimate

$1,000,000 – $3,000,000

While the RFP does not disclose a contract ceiling, a four‑year engineering services contract that includes multiple design phases, permit preparation, construction observation for several wells, and an ASR system typically ranges between $1 million and $3 million in total fees. The low end assumes a modest design and limited construction oversight; the high end reflects full‑service engineering, extensive regulatory work, and a larger ASR infrastructure. Factors influencing the final amount include the final construction cost estimate, the complexity of the ASR design, and the level of subcontracting required for drilling and lab analysis.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Citrus County - Board of County Commissioners·Florida

Top match · 78%

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

Citrus County, Florida·Florida

76% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

California Grants·California

72% match

Clean Water State Revolving Fund (CWSRF) Program

Rolling / TBD closeOpened 3/5/2025

California Grants·California

71% match

Drinking Water State Revolving Fund (DWSRF) Construction

Rolling / TBD closeOpened 8/2/2022

County of San Luis Obispo·California

71% match

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

California Grants·California

71% match

Drinking Water State Revolving Fund (DWSRF) Planning

Rolling / TBD closeOpened 8/1/2022

City of Riverside·California

71% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

Eastern Municipal Water District·California

70% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

California Grants·California

70% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

California Grants·California

69% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

69% match

Orphan Site Cleanup Fund

Rolling / TBD closeOpened 9/2/2026

California Grants·California

69% match

Farm and Ranch Solid Waste Cleanup and Abatement Grant Program FR92

Rolling / TBD closeOpened 3/24/2026

Texas Brazos River Authority·Texas

69% match

RFP EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

Closes 11/10/2026Opened 8/3/2026

California Grants·California

69% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

California Grants·California

69% match

Proposition 1 Regionwide Grants

Rolling / TBD closeOpened 1/27/2025

Manatee County - Purchasing Division·Florida

69% match

SEWRF 3rd Sludge Holding Tank

Closes 11/16/2026Opened 9/9/2026

Sarasota County·Florida

69% match

Physical Map Revision for Little Sarasota Bay, Lemon Bay, and Phillippi Creek Watersheds

Closes 11/19/2026Opened 10/21/2026

California Grants·California

69% match

Cleanup, Remediation, and Watershed Enhancement Funding Opportunity

Rolling / TBD closeOpened 5/27/2025

California Grants·California

69% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

California Grants·California

69% match

Baldwin Hills & Urban Watersheds Conservancy (BH UWC) Proposition 4: Community and Climate Resilience Grant Program

Rolling / TBD closeOpened 5/6/2026

Mission Springs Water District·California

69% match

Financial and Water Resources Management Support Services

Closes 11/4/2026Opened 10/21/2026

California Grants·California

68% match

Prop 4 – Wildfire and Forest Resilience

Rolling / TBD closeOpened 6/8/2026

California Grants·California

68% match

Inland Wetlands Conservation

Rolling / TBD closeOpened 6/18/2025

California Grants·California

68% match

Farm and Ranch Solid Waste Cleanup and Abatement Grant Program FR93

Rolling / TBD closeOpened 3/24/2026

California Grants·California

68% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026