Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›LRRT – Catenary and Insulator Replacement Phase 5

NYS Niagara Frontier Transportation Authority·New York

LRRT – Catenary and Insulator Replacement Phase 5

Closes 5/27/2026$5M – $15MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Work of this project provides for the furnishing of all labor, materials, appliances, tools, equipment and the performing of all Work in accordance with these specifications and drawings, with exception of work that is expressly and specifically not included in the project. The project consists of one (1) contract: LRRT – Catenary and Insulator Replacement – Phase 5, with a scope of work divided into Base Bid items The Base Bid consists of replacement of approximately 18,641-linear-feet of Contract Wire, necessary assemblies and insulators which shall include, but not be limited to: • Mobilization. • Contractor Work Plan. • Catenary and Insulator Replacement. • Allowance. • Existing and New OCS Anchor Inserts. • RWP / RWIC Services. • Engineer’s Field Office. Refer to the Project Manual and Contract Drawings for further information. The NFTA reserves the right to cancel this procurement, waive irregularities, reject any or all bids and extend the bidding period. Bid security must accompany each bid and must be in an amount not less than ten percent of the total bid price if the base bid exceeds $50,000.00. Bid security may be submitted prior to bid opening either electronically utilizing Surety2000 at www.surety2000.com or delivered to the NFTA in an opaque sealed envelope. Details for electronic submission are provided on the NFTA’s Engineering Branch website. In the event a bidder utilizes an offline bid but provides bid security electronically the electronic bid bond number must be submitted with the offline bid. The Contractor shall perform not less than 50% of the work with its own labor forces. Refer to Technical Specification Section 01 11 00 “Summary of Work” for the anticipated Notice(s) to Proceed, Project Duration, and additional time constraints associated with this project. Liquidated damages will be assessed against the Contractor for its failure to complete the project within the time specified as described in Technical Specification Section 01 11 00 “Summary of Work”. The percentage goal of Disadvantaged Business Enterprise (DBE) participation in the project shall be 0% (zero percent). Technical questions should be submitted via email to Mott MacDonald, Michael Rao, at [email protected]. Administrative questions should be submitted via email to NFTA, Jorge Cueto, email: [email protected] Technical or administrative questions must be submitted before May 18, 2026, at 10:00 am. A Pre-Bid conference will be held on May 5, 2026, at 09:00 a.m. at the 1st Floor Conference Room of the Metropolitan Transportation Center (MTC) located at 181 Ellicott Street, Buffalo, New York 14203. Note that parking is not provided. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 0.00% WBE Goal: 0.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Cynthia Cirbus(Administrative Assistant)

[email protected]

(716) 855-7342

Key dates

Opened
4/28/2026
Questions due
5/18/2026
Pre-bid meeting
5/5/2026
Closes
5/27/2026
Duration
249 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
11LZ2332

Budget estimate

$5,000,000 – $15,000,000

The budget for this project is not explicitly stated in the document. However, based on the scope of work and the contract term, we can estimate the budget to be in the range of $5 million to $15 million. This estimate is based on the assumption that the project requires significant labor and material costs, and the contractor will need to mobilize equipment and personnel to complete the work within the specified time frame. The actual budget may vary depending on the bids received and the final contract award.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Glendale·California

Top match · 67%

TRANSFORMER & LTC REPAIR

Closes 11/5/2026Opened 9/22/2026

NYS Niagara Frontier Transportation Authority·New York

67% match

LRRT - Fastener & Pad Replacement Phase 14

Closes 11/5/2026Opened 10/5/2026

U.S. Postal Service·Colorado

65% match

Denver, CO Denver P&DC Roof Replacement K95856

Closes 11/20/2026Opened 10/19/2026

NYS MTA - Metro-North Railroad·New York

65% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

Santa Clara Valley Transportation Authority·California

64% match

Guadalupe Light Rail Vehicle Wash Improvements

Closes 11/13/2026Opened 9/16/2026

City of Palo Alto·California

64% match

Refurbishment of Existing On Load Tap Changer at Adobe Creek Substation - AC21

Closes 11/3/2026Opened 10/15/2026

Education, NYS Dept. of·New York

64% match

NYSSD Electrical Panel Replacement

Closes 11/3/2026Opened 10/13/2026

Iowa State University·Iowa

64% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

City of Lake City and City of Bellechester·Minnesota

64% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

Bristol Virginia Utilities Authority·Virginia

64% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of Rockford·Illinois

64% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

63% match

Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A

Closes 11/5/2026Opened 9/21/2026

Chesapeake Bay Bridge and Tunnel District·Virginia

63% match

IFB M-26-004 Replace Vent Building UPS

Closes 11/6/2026Opened 9/18/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

63% match

FRSMP277009/JLM-Lighting Phase 2

Closes 12/2/2026Opened 10/23/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

63% match

LAMP: F96 T8/T12 HO LED LINEARREPLACEMENT

Closes 12/31/2026Opened 4/6/2026

U.S. Department Of Energy·California

63% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

63% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

City of Bellevue·Washington

63% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·Oklahoma

63% match

15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

Closes 11/10/2026Opened 10/27/2026

City of Charlotte·North Carolina

63% match

Train Control Grade Crossing Spare Parts Contract

Rolling / TBD closeOpened 4/1/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

63% match

MFSE ATC Replacment Project Update

Rolling / TBD closeOpened 4/11/2026

City of Rockford·Illinois

63% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

Hawaii Department of Defense·Hawaii

63% match

TRANSFORMER REPLACEMENT

Closes 11/19/2026Opened 10/19/2026

U.S. Department Of Defense·Pennsylvania

63% match

TRANSFORMER, PSRL

Closes 11/2/2026Opened 9/30/2026