The Federal Highway Administration, Central Federal Lands Highway Division (CFLHD), is replacing the existing low water crossing at Burr Trail Road over Bullfrog Creek with a one-lane bridge structure. The project requires a drilling contractor to conduct a geotechnical subsurface investigation, including two geotechnical borings and two subgrade borings. The contractor will need to provide drilling services, including hollow stem augers and HQ3 wireline coring, and collect samples. The project is located approximately 13 miles southwest of Ticaboo, UT.
• The contractor will need to mobilize and demobilize to the site, and provide traffic control signs and cones to define the work area.
• The contractor will need to provide a water truck or trailer with an adequate capacity to handle the drilling conditions.
• The contractor will need to provide five 5-gallon buckets with lids and four core boxes for sample collection.
• The contractor will need to provide a daily mobilization rate and a per diem rate based on CONUS.
• The contractor will need to provide a stand-by rate due to weather.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.