Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Information Technology RFPsInformation Technology and Software Development Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More IT services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›7E--Computational Infrastructure - GPU Server Node

U.S. Department Of The Interior·Virginia

7E--Computational Infrastructure - GPU Server Node

Closes 7/24/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Department of the Interior, Interior Business Center, is seeking a computational infrastructure solution that includes a GPU server node. The preferred configuration should include 128-192 total physical CPU cores, high memory bandwidth, and PCIe Gen5 support to maximize GPU performance and data throughput. The system should also include 1 TB ECC DDR5 RAM, expandable to 2 TB or greater, and a tiered enterprise storage solution with 100 TB usable capacity at deployment. The solution should support concurrent execution of AI/ML workflows, large imaging datasets, virtualization, database services, laboratory information management systems, and multimodal data integration. • The preferred CPU architecture is an enterprise-class dual-socket server utilizing the latest available generation of Intel Xeon or AMD EPYC processors. • The preferred storage architecture is a tiered enterprise storage solution consisting of enterprise NVMe SSDs for primary storage and high-capacity enterprise SSD or SAS storage for secondary storage. • The system should provide dual redundant 100 Gb Ethernet interfaces for high-performance data movement and additional 25 Gb and 10 Gb Ethernet interfaces for laboratory instrument connectivity. • Support for NVIDIA AI Enterprise (NVAIE) or equivalent enterprise AI software is preferred.

Attached files

Contact

Melissa Onyszko(Primary Contact)

[email protected]

(703) 964-3638

Key dates

Opened
7/17/2026
Questions due
7/20/2026
Closes
7/24/2026

Last updated

Details

Type
Request for Proposal
Industry
Information Technology and Software Development
NAICS
334111
Solicitation №
DOIDFBO260071

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is difficult to estimate because the document does not provide a specific budget or price range. However, based on the complexity of the computational infrastructure solution and the requirements for high-performance hardware and software, it is likely that the budget will be in the range of $500,000 to $2 million. This estimate is influenced by the cost of high-end servers, storage systems, and software licenses, as well as the potential need for ongoing maintenance and support services.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Navajo Nation·Arizona

Top match · 65%

Proposal for IT Server Upgrade

Rolling / TBD closeOpened 6/18/2025

NYS Empire AI Consortium, Inc·New York

62% match

Computing Assets and White Space Infrastructure Advanced SI/AI and HPC Computing Infrastructure • Up to 5 MW IT Load

Closes 12/4/2026Opened 10/29/2026

Waco ISD·Texas

61% match

Migration of On-Premise Virtualization Infrastructure

Closes 11/12/2026Opened 10/22/2026

U.S. National Science Foundation·United States of America

61% match

Community Infrastructure for Research in Computer and Information Science and Engineering (CIRC)

Closes 9/10/2027Opened 6/6/2025

U.S. Department Of Defense·United States of America

61% match

SuperServer

Closes 11/3/2026Opened 10/27/2026

Pearland ISD·Texas

61% match

Computer Hardware, Software, Services, Consulting, and Support -Cycle 7

Closes 12/10/2026Opened 7/29/2026

National Aeronautics And Space Administration·California

60% match

High-Performance Space Computing (HPSC) (Pre-RFI Market Research)

Closes 11/13/2026Opened 10/6/2026

U.S. Department Of Energy·Tennessee

60% match

Grid Research Innovation and Development Center Technology Collaborations for US Power Electronics Industries

Closes 8/2/2029Opened 8/2/2024

City and County of San Francisco·California

60% match

OCA | TC91116 Networking Equipment & Support

Closes 11/25/2026Opened 10/22/2026

U.S. Department Of Defense·New York

59% match

EXTREME COMPUTING

Closes 9/20/2028Opened 9/20/2023

Lewisville ISD·Texas

59% match

Datacenter Network Refresh

Closes 11/6/2026Opened 10/2/2026

U.S. National Science Foundation·United States of America

59% match

U.S. National Science Foundation State and Regional Artificial Intelligence Infrastructure Hubs:

Closes 11/4/2026Opened 8/6/2026

U.S. Idaho Field Office·United States of America

59% match

RFI - DOE R

Rolling / TBD closeOpened 1/14/2016

U.S. Department Of Defense·New York

59% match

EXTREME COMPUTING

Closes 9/20/2028Opened 9/24/2026

Caddo Parish School Board·Louisiana

59% match

NETWORK ELECTRONICS

Closes 11/19/2026Opened 10/20/2026

Hampton Regional Medical Center·South Carolina

59% match

Hampton Regional Medical Center VMware virtual infrastructure

Closes 11/6/2026Opened 10/21/2026

Texas Houston-Galveston Area Council·Texas

59% match

Computer Technology and Related Solutions

Closes 12/10/2026Opened 10/28/2026

Pearland ISD·Texas

59% match

Computer Hardware, Software, Services, Consulting, and Support -Cycle 8

Closes 12/11/2026Opened 8/25/2026

U.S. National Science Foundation·United States of America

58% match

Computational and Data-Enabled Science and Engineering

Rolling / TBD closeOpened 8/15/2024

City of Hollywood·Florida

58% match

Meter Transmission Unit / VertexOne Consumer Portal

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Defense·Virginia

58% match

ACME SERVER

Closes 11/10/2026Opened 10/28/2026

University of Texas at San Antonio·Texas

58% match

222113775 AI CPU JM

Closes 11/9/2026Opened 10/23/2026

Chula Vista Elementary School District·California

58% match

Network Hardware E-Rate Year 2027/2028

Closes 11/18/2026Opened 10/16/2026

Jurupa Unified School District·California

58% match

Network Equipment (E-Rate Year 30)

Closes 11/30/2026Opened 10/27/2026

New York State Energy Research and Development Authority·New York

58% match

Grid Modernization Utility Challenge – National Grid

Closes 11/10/2026Opened 10/8/2026