Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Water Main Replacements 2026 Ph 2 & PRV

City of Bellevue·Washington

Water Main Replacements 2026 Ph 2 & PRV

Closes 4/9/2026$7M – $7.5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bellevue is seeking bids for the Water Main Replacements 2026 Ph 2 & PRV project. The project involves replacing approximately 10,100 linear feet of ductile iron water mains, installing new fire hydrant assemblies, and replacing water services. The project also includes constructing a replacement Pressure Reducing Valve in a concrete vault and abandoning the existing Pressure Reducing Valve station. The contractor will be required to restore surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks. The project is estimated to cost between $7 million and $7.5 million. • The contractor must comply with the City of Bellevue's Water Engineering Standards and the Developer Extension Agreement. • The contractor must use ductile iron pipe class 52 unless otherwise specified. • The contractor must provide a certified Erosion and Sediment Control Lead to administer and implement the Construction Stormwater Pollution Prevention Plan. • The contractor must furnish a manufacturer's certification of compliance with the requirements for each type of product furnished for installation. The project requires the contractor to have experience with water main replacements, pressure reducing valve installations, and erosion control measures. The contractor must also be familiar with the City of Bellevue's standards and regulations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelly Dang(Bid Contact)

[email protected]

(425) 452-4870

Key dates

Opened
3/26/2026
Closes
4/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237910
Solicitation №
26022

Budget estimate

$7,000,000 – $7,500,000

Based on the estimated cost of the project, which is between $7 million and $7.5 million, the budget for the contractor can be estimated to be around $7 million to $7.5 million. However, this amount may vary depending on the actual cost of materials, labor, and other expenses. The budget may also be influenced by the complexity of the project, the experience of the contractor, and the level of competition in the bidding process.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 71%

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

City of Bellevue·Washington

70% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Oregon Tualatin Valley Water District·Oregon

68% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of DeLand·Florida

68% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Bellevue·Washington

68% match

PRV Replacements 2026 Phase 1 PRV 108

Closes 11/19/2026Opened 10/29/2026

Goodwyn Mills Cawood·Georgia

67% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Agriculture·Utah

67% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

City of Beaumont·California

67% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Western Virginia Water Authority·Virginia

67% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Riverside·California

67% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Redlands·California

66% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Ontario·California

66% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Village of Wilmette·Illinois

66% match

2027 Water Main Replacement Construction Engineering Services

Closes 11/4/2026Opened 10/15/2026

Northern Kentucky Water District·Kentucky

66% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

City of Edgewater, FL·Florida

66% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

Massachusetts Town of Plymouth·Massachusetts

66% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

City of Saint Peter·Minnesota

66% match

Saint Peter, City of 2026 Lead Service Line Replacement BMI No. 26X.142592

Closes 11/13/2026Opened 10/16/2026

City of Holly Grove·Arkansas

65% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

Northern Kentucky Water District·Kentucky

65% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

St. Helena Parish Police Jury·Louisiana

65% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

Arkansas

65% match

Bid Water Main and Stabilization

Rolling / TBD closeOpened 10/18/2026

New York City Department of Design and Construction·New York

65% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

City of Hollywood·Florida

65% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Grand Forks, North Dakota·North Dakota

65% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

Santa Maria-Bonita School District·California

64% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026