Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Ticonderoga Manufactured Home Replacement

NYS PRIDE of Ticonderoga·New York

Ticonderoga Manufactured Home Replacement

Closes 5/8/2026$70k – $150kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

REQUEST FOR PROPOSALS (RFP) Manufactured Home Replacement Project - Ticonderoga, NY Issued by: North Country Rural Development (NRDC) I. INTRODUCTION North Country Rural Development (NRDC) is soliciting proposals from qualified manufactured home retailers and site work contractors to complete the replacement of a substandard manufactured home with a new, ENERGY STAR® Certified manufactured home. This project is funded through the New York State HOME Program and must comply with the NYS HOME Program Manual for Manufactured Housing Replacement, as well as all applicable HUD, state, and local requirements. NRDC is not acting as a general contractor. Proposals are welcome from: Manufactured home retailers able to provide and install HUD- and ENERGY STAR–certified homes; Site work contractors able to complete foundation/slab, utility connections, grading, and demolition work; or Teams that include both (NRDC can assist in connecting interested bidders). II. PROJECT OVERVIEW This scope of work provides a description of the required work. Contractors are responsible for confirming all field dimensions, site conditions, and detectable defects prior to bidding. Change orders will not be issued for discovery items that are not hidden defects. All work shall be performed in a “best practice” manner using materials equal to or better than those being replaced. Color selections, finishes, and similar aesthetic options shall be made by the NRDC client. Placement:The placement of this home will be on the same footprint of the current home. III. DETAILED SCOPE OF WORK A. Site Plan Contractor shall prepare and submit a detailed site plan prior to any construction or installation activity. B. Permitting Contractor is responsible for securing all necessary local and state permits for site work, foundation, septic, demolition, and utility connections. C. Site Evaluation Contractor shall perform a pre-construction site evaluation to identify subcontractors, site conditions, and necessary pricing updates. IV. MANUFACTURED HOME REQUIREMENTS Home Type:New, ENERGY STAR® Certified Manufactured Home meeting or exceeding the Manufactured Home Construction and Safety Standards (HUD Code, 24 CFR Part 3280) and ENERGY STAR Manufactured Home Program requirements per the NYS HOME Program Manual. Certification: Home must bear both the HUD certification label (red tag) and the ENERGY STAR label affixed by the manufacturer. Documentation of ENERGY STAR certification must be provided at delivery. General Specifications (Minimum): 3 bed, 2 bath single-wide - 1000 sq ft. VIN and serial number(s) must be recorded prior to installation Electric, all-energy system (no fossil fuel appliances) 200-amp electrical service Single-hung, Low-E vinyl windows Vinyl sheet flooring throughout 30” frost-free refrigerator with bottom freezer 30” electric range 30–40-gallon electric water heater ENERGY STAR certified, HUD-compliant heat pump or electric furnace with central A/C Insulation to meet HUD minimum standards (R-22 floor, R-21 walls, R-30 ceiling) ⅜" exterior OSB sheathing 25-year asphalt shingles 40-lb roof snow load minimum Gutters V. FOUNDATION AND INSTALLATION Foundation Type:All foundation systems shall meet HUD durability standards, New York State Building Code, and cold-climate construction best practices to prevent frost heave and ensure long-term stability. Design Standards: Foundations must comply with HUD’s Design Guide for Frost-Protected Shallow Foundations (FPSF) or be constructed to extend below the local frost line. FPSF or frost-free systems must be sealed by a licensed engineer or architect and demonstrate compliance with IRC R403.3 and HUD guidelines. Insulation & Drainage: Insulation must meet HUD-recommended R-values for cold regions, be continuous, and protected from moisture and damage. Proper drainage and grading are required to divert water away from the foundation. Manufactured/Modular Homes: Systems must comply with HUD Model Manufactured Home Installation Standards (24 CFR 3285) and the June 21 2017 Interpretive Bulletin on frost-zone foundations. Frost-free alternatives require stamped professional design and local code approval. Verification: Contractor must submit foundation design, insulation layout, and drainage plan for approval. Work is subject to inspection and must be warranted against frost heave or settlement for at least one year. Concrete Pads:Minimum 3000 psi, with pre-set anchor hubs for tie-downs. Tie-down and anchoring systems must resist uplift, overturning, and lateral movement, per manufacturer’s specs. If an alternative engineered design is used, it must be certified by a licensed professional engineer and accepted by the local code official. Proper site grading and drainage shall be ensured to prevent frost heave. VI. SITE WORK & UTILITIES Site Preparation:Perform excavation and grading as required for proper home siting, drainage, and utility placement. Backfill with clean sandy fill. Utilities:Connect home to all utilities (electric, water, sewer) in compliance with local codes. VII. SKIRTING & EXTERIOR Install insulated skirting with vapor barrier and flashing protection per manufacturer’s instructions. VIII. STEPS, LANDINGS, AND RAMPS Construct self-supporting, pressure-treated front and rear entry decks, landings, stairs, or ramps as required by local code.No loads shall be transferred to the manufactured home structure. IX. GRADING & SEEDING Final grade disturbed areas, add minimum 2” topsoil, seed, and hay mulch for erosion control.Place ¾” stone around the foundation perimeter for drainage. X. DISPOSAL Contractor is responsible for complete removal and legal disposal of the existing home, additions, and debris at a licensed facility.Provide disposal receipts to NRDC. XI. FINAL APPROVAL Contractor must obtain a Certificate of Installation or local final inspection approval for the home’s setup and all site work.Post-construction radon testing shall be conducted on the lowest regularly occupied level. XII. PROPOSAL REQUIREMENTS Proposals must include: Company name, contact person, and license information Proof of insurance and workers compensation Itemized cost estimate Estimated project schedule Spec sheet for proposed model Potential floor plan NRDC welcomes separate proposals from home retailers and site contractors. If submitting separately, NRDC will coordinate partnerships between selected bidders to ensure full project delivery. One entity must act as the GC. XIII. SUBMISSION INFORMATION Proposal Due Date: Friday, May 8th at 4:00pmSubmit Proposals To: [email protected] Questions may be directed to Hope Carroll at [email protected] or (518) 585-6366. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: None Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 10.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 20.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 10.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Hope Carroll(Program Manager)

[email protected]

(518) 585-6366

Key dates

Opened
4/9/2026
Closes
5/8/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236115
Solicitation №
TBD

Budget estimate

$70,000 – $150,000

The budget for this project can be estimated based on the cost of a new manufactured home and the site work required. The cost of a new manufactured home can range from $50,000 to $100,000, depending on the size and features of the home. The cost of site work, including foundation installation, utility connections, and grading, can range from $20,000 to $50,000. Therefore, the total budget for this project can be estimated to be between $70,000 and $150,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 60%

HOUSING ASSEMBLY,AI

Closes 11/30/2026Opened 10/29/2026

Connecticut Town of Cheshire·Connecticut

59% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026

Wyoming State Construction Department·Wyoming

59% match

Boiler Plant & Controls Replacement - Wyoming Pioneer Home - Wyoming Dept. of Health

Closes 11/20/2026Opened 8/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

59% match

Replace Roof & Associated Mechanicals

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of The Interior·Oregon

59% match

T--NHOTIC AV SYSTEM REPLACEMENT

Closes 11/20/2026Opened 10/7/2026

U.S. Postal Service·Colorado

59% match

Denver, CO Denver P&DC Roof Replacement K95856

Closes 11/20/2026Opened 10/19/2026

Pennsylvania Philadelphia Regional Port Authority·Pennsylvania

59% match

Tioga Rail Infrastructure Repairs

Closes 11/5/2026Opened 10/7/2026

State of Delaware DSHA·Delaware

59% match

Roofing Replacement at Burton Village

Closes 11/10/2026Opened 10/19/2026

Nevada State Public Works Division·Nevada

58% match

Roofing Replacement, Non-profit Fish House (25-S01-11)

Closes 11/17/2026Opened 10/16/2026

NYS PRIDE of Ticonderoga·New York

58% match

RFP Opportunity - 2 Lake Placid Manufactured Home Replacements

Closes 11/2/2026Opened 10/9/2026

Indiana Natural Resources·Indiana

58% match

Driveshaft/gearboxes for bush hog Atterbury FWA

Closes 11/13/2026Opened 10/10/2026

NYS OGS Design & Construction - Construction Contractors·New York

58% match

Replace Roof & Associated Mechanicals – Troop F Headquarters, Middletown, NY

Closes 11/18/2026Opened 10/13/2026

City of Toledo·Ohio

58% match

Chemical Feed Boiler Replacement

Closes 11/17/2026Opened 10/23/2026

Connecticut Litchfield County Housing Opportnty·Connecticut

58% match

Sharon Housing Trust: Siding, Windows, Doors, Trim, and Paint

Closes 11/6/2026Opened 10/9/2026

Connecticut Town of Monroe·Connecticut

58% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/2/2026Opened 10/21/2026

NYS Titan Roofing, Inc.·New York

58% match

47971CHE: Replace Roof & Associated Mechanicals

Closes 11/17/2026Opened 10/19/2026

Connecticut Town of Monroe·Connecticut

58% match

Architectural & Engineering Design Services Roof Replacement - Jockey Hollow

Closes 11/4/2026Opened 10/21/2026

Forest Preserve District of DuPage County·Illinois

58% match

Maple Meadows Golf Clubhouse Renovations

Closes 11/4/2026Opened 10/13/2026

NYS OGS Design & Construction - Construction Contractors·New York

58% match

Replace Roof & Associated Mechanicals – Troop F Headquarters (Project No. 47971)

Closes 11/18/2026Opened 10/13/2026

Connecticut City of New Britain·Connecticut

58% match

ROOF REPLACEMENT AT BADOLATO GARAGE & FIRE STATION #1 - BID NO. 27-003

Closes 11/3/2026Opened 10/26/2026

U.S. Department Of Defense·Texas

57% match

AH-64 Non-Rotating Control Swashplate Assembly Liner Replacement

Closes 11/3/2026Opened 10/26/2026

Department Of General Services·Maryland

57% match

TV 673-230-003-Shingled Roof Replacement- Garrett Co, Md

Closes 4/13/2030Opened 4/12/2023

Connecticut Town of Cheshire·Connecticut

57% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026

Town of Bridgton·Maine

57% match

RFPs Requested – Town Boiler System Replacement

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of Defense·Oklahoma

57% match

Housing, Mechanical

Closes 11/20/2026Opened 10/6/2026