Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Jersey guideNew Jersey Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Jersey
  4. ›Construction
  5. ›Pool Alteration at Chancellor Annex Addendum No. 1.pdf

Newark Board of Education·New Jersey

Pool Alteration at Chancellor Annex Addendum No. 1.pdf

Closes 7/30/2026$2M – $4MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Newark Board of Education is seeking a qualified contractor to perform comprehensive alterations and additions to the swimming pool facility at the Chancellor Avenue Annex. The scope includes demolition, plumbing, HVAC‑R, electrical, fire‑alarm, building‑management system tie‑ins, asbestos remediation, site work, and the installation of a new pool system, all to be completed within a 260‑working‑day schedule. Work during the school year is restricted to a second‑shift schedule (3 p.m.–11 p.m.) unless first‑shift approval is obtained, and all fire‑alarm and BMS work must be priced as a lump‑sum with no separate allowances. The contractor must retain qualified subcontractors for ten specific trade classifications and coordinate with existing vendors for fire‑alarm, BMS, and roofing warranty services. • Required trades: plumbing (C030), HVAC‑R (C032), electrical (C047), demolition (C021), fire‑alarm (C049), site work (C054), sewer/storm (C056), asbestos (C092), school furnishings (C105), swimming pools (C108). • Materials: 316L stainless‑steel spiral duct (22‑24 gauge) per SMACNA; specialty ceiling as shown on drawing A103. • Schedule: 260 working days, second‑shift only during school sessions, bid deadline July 30, 2026.

Attached files

Key dates

Opened
6/9/2026
Site visit
7/14/2026
Closes
7/30/2026
Duration
260 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
10258R

Budget estimate

$2,000,000 – $4,000,000

No budget is disclosed, but a full‑scale public‑school pool renovation with extensive MEP, demolition, and specialty finishes typically ranges from $2 million to $4 million in New Jersey. Factors influencing the final amount include the condition of existing infrastructure, the cost of stainless‑steel ductwork, asbestos remediation, and the need for coordinated vendor tie‑ins.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Newark Public Schools·New Jersey

Top match · 80%

Pool Alteration at Chancellor Ave. Annex Drawings

Rolling / TBD closeOpened 4/20/2026

Newark Public Schools·New Jersey

78% match

Pool Alteration at Chancellor Ave Annex Technical Specifications

Rolling / TBD closeOpened 7/9/2026

City of Salina·Kansas

74% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

City of Salina·Kansas

73% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

73% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

City of Salina·Kansas

73% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Dillon·South Carolina

72% match

City of Dillon bathroom and concession addendum 1

Closes 11/16/2026Opened 9/22/2026

City of Salina·Kansas

71% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

New Milford Public Schools·Connecticut

71% match

RFP E 2626-001 NMHS Tennis Courts Addendum 2

Rolling / TBD closeOpened 8/7/2026

City of Muskogee·Oklahoma

71% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

San Gabriel Unified School District·California

70% match

Addendum One_Narrative - McKinley Irrigation Replacement

Rolling / TBD closeOpened 8/4/2026

Northern Virginia Parks·Virginia

70% match

Addendum 2

Rolling / TBD closeOpened 10/28/2026

Michigan Warren Consolidated Schools·Michigan

69% match

RFP - WCS 2022 Bond - BP 18 SHHS PAC - Addendum 1

Closes 11/5/2026Opened 10/29/2026

Borough of Eatontown·New Jersey

69% match

Meadowbrook School Parking Lot Improvements - Addendum No. 1

Rolling / TBD closeOpened 7/30/2026

City of Pinckneyville·Illinois

69% match

Pinckneyville Municipal Pool Upgrades

Closes 11/5/2026Opened 10/8/2026

City of Galesburg·Illinois

69% match

Addendum 1 - Class 7 Dump Truck Cab/Chassis for the Park Division

Closes 11/4/2026Opened 10/22/2026

University of Alaska Fairbanks - Design and Construction·Alaska

69% match

Patty Center Pool Code Corrections – University of Alaska Fairbanks (UAF IFB D21033 PCPCC)

Closes 11/12/2026Opened 10/8/2026

New Milford Public Schools·Connecticut

69% match

RFP E 2627-001 NMHS Tennis Courts Addendum 2

Rolling / TBD closeOpened 8/11/2026

School District of Oconee County·South Carolina

68% match

RFB#990-539 Addendum #1

Rolling / TBD closeOpened 10/5/2026

Northern Virginia Parks·Virginia

68% match

Addendum 1

Rolling / TBD closeOpened 10/23/2026

San Gabriel Unified School District·California

68% match

2026-Bid-SG-05_Addendum Three_Drawing - Roosevelt ES Playground Replacement

Rolling / TBD closeOpened 8/4/2026

Town of Lexington·South Carolina

68% match

ADDENDUM 2 CHERRY RIDGE DRAINAGE IMPROVEMENT PROJECT

Closes 10/29/2027Opened 10/27/2026

City of Salina·Kansas

68% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

Florida Department of Environmental Protection (DEP)·Florida

67% match

Addendum #1: BDC07-26/27 - Long Key State Park – Long Key Beach Nourishment and Campground Rebuild

Closes 11/19/2026Opened 10/28/2026

Columbus State Community College·Ohio

67% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026