Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›G2-G11 Canal Improvement Project Construction of Group A

City of Edgewater, FL·Florida

G2-G11 Canal Improvement Project Construction of Group A

Closes 11/4/2025$500k – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Edgewater is accepting sealed bids for the G2-G11 Canal Improvement Project Construction of Group A, funded by Florida Commerce for the improvements to the G-2 and G-11 canals. The project includes construction, canal or aquaduct, pipe culvert, sewer and storm drain, utility and underground projects, and water system, plants, main and service line. A non-mandatory pre-bid conference will be held on October 2, 2025, and an onsite visit will occur immediately after the pre-bid meeting. The contractor must visit the site and carefully examine the conditions to be encountered in performing the work. Key aspects of the project include: • Construction of the G2-G11 canals • Improvements to the canal system • Pipe culvert construction • Sewer and storm drain construction • Utility and underground projects • Water system, plants, main and service line construction • Maintenance and repair of the canal, sewer and storm drain, and utility and underground projects

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Pat Drosten(Purchasing Specialist)

[email protected]

Key dates

Opened
9/18/2025
Pre-bid meeting
10/2/2025
Site visit
10/2/2025Mandatory
Closes
11/4/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
ITB-ITB 25-PW-05-0-2025/PMD

Budget estimate

$500,000 – $5,000,000

The estimated budget for this project is difficult to determine as the document does not provide a specific budget or cost estimate. However, considering the scope of work, which includes construction of canals, pipe culverts, sewer and storm drains, and utility and underground projects, the budget could be substantial. A rough estimate for a project of this nature could be in the range of $500,000 to $5,000,000, depending on the complexity and scale of the work. Factors that may influence the likely payment range include the cost of materials, labor, and equipment, as well as any potential change orders or unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of Transportation·California

Top match · 64%

Construct GSRD, DPPIA and install irrigation system.

Closes 12/8/2026Opened 10/19/2026

U.S. Department Of The Interior·Utah

64% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

St. John the Baptist Parish Government·Louisiana

64% match

Bid 2026.27 Canal Maintenance Project

Closes 11/24/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

63% match

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

Closes 12/1/2026Opened 10/28/2026

Town of Church Point·Louisiana

63% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of The Interior·Colorado

63% match

Y--EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/25/2026

U.S. Department Of Defense·Texas

62% match

FY26 Harlingen Placement Area (PA)13 and 10 Improvements

Closes 12/17/2026Opened 12/3/2025

Terrebonne Parish Consolidated Waterworks District No. 1·Louisiana

61% match

Boudreaux Canal Crossing Waterline Replacement TPCW Project No. H.002244

Closes 11/10/2026Opened 10/13/2026

City of Panama City·Florida

61% match

SRF Area P-12 Improvements

Closes 11/13/2026Opened 10/7/2026

North Carolina Orange Water and Sewer Authority·North Carolina

61% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

U.S. Department Of The Interior·Arizona

61% match

Y--MOD/MODE/US BYPASS CANAL REPAIRS

Closes 11/20/2026Opened 10/27/2026

Placer County Water Agency·California

61% match

On-call Canal Gunite Installation

Closes 11/17/2026Opened 10/12/2026

City of Bellevue·Washington

60% match

Meydenbauer Bay Park Phase 2 - GC/CM Services

Closes 12/4/2026Opened 10/22/2026

U.S. Department Of Defense·Texas

60% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

U.S. Department Of Defense·Pennsylvania

60% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

North Carolina Orange Water and Sewer Authority·North Carolina

60% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/26/2026

City of Pomona·California

60% match

RESERVOIR NO. 2C REPAIRS AND SAFETY IMPROVEMENTS FD528 – CC8125 – PROJECT WORKTAG 95082

Closes 11/18/2026Opened 10/8/2026

Alaska Department of Environmental Conservation – Village Safe Water Program·Alaska

60% match

Notice of Categorical Exclusion Determination - Marshall Phase 9 Water and Sewer Improvements

Rolling / TBD closeOpened 9/25/2026

U.S. Department Of Defense·Louisiana

60% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 8/10/2026

U.S. Department Of Defense·Illinois

60% match

PRESOLICITATION NOTICE FOR LAKE GEORGE EAST PHASE II DREDGING, EAST CHICAGO, LAKE COUNTY, ILLINOIS

Closes 11/19/2027Opened 11/19/2025

City of Opa-locka·Florida

60% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

60% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Town of Cutler Bay·Florida

60% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

County of Frederick, MD·Maryland

60% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026

Imperial Irrigation District·California

60% match

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026