The project involves the mechanical dredging of approximately 14,000 cubic yards of sediment from the Grand Traverse Harbor entrance channel to return it to its design depth. The dredged material will be placed on the beach approximately 700 feet north of the break wall. The project requires the contractor to perform mobilization, demobilization, submittals, and site services, as well as pre-dredge and post-dredge bathymetric surveys. The contractor must also ensure that the dredged material does not block residents' views and provide access ramps periodically across large piles for beach access.
• Key work and scope-of-work elements include:
• Mechanical dredging of sediment
• Placement of dredged material on the beach
• Mobilization and demobilization
• Submittals and site services
• Pre-dredge and post-dredge bathymetric surveys
• Ensuring dredged material does not block residents' views
• Providing access ramps for beach access
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.