Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Civil Engineering
  5. ›Cedar Valley Nature Trail Erosion Repairs

City of Cedar Rapids·Iowa

Cedar Valley Nature Trail Erosion Repairs

Closes 9/9/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cedar Rapids is seeking qualified contractors to perform erosion repair and trail restoration on the Cedar Valley Nature Trail. Work includes removal of damaged sections, installation of geotextile fabric, filter‑sock rock bags, slope re‑grading, temporary erosion and sediment control measures, and final landscaping to restore trail usability and meet NPDES storm‑water requirements. All bids must be submitted electronically through the City’s IonWave e‑procurement portal by the close date. • Scope: Erosion control, slope stabilization, rock‑bag filter units, geotextile installation, topsoil placement, seeding and mulching. • Location: Cedar River floodplain within Cedar Rapids, IA. • Required compliance: Iowa Statewide Urban Design and Specifications (SUDAS), NPDES permit, local storm‑water pollution prevention plan. • Contractor responsibilities: Utility coordination, traffic control plan, weekly erosion‑control inspections, provision of maintenance bond (4‑year warranty on water‑system improvements). • Submission: Electronic sealed bids only; no hard‑copy, fax, or email bids accepted. • Key dates: Issue 8/26/2026, Questions due 9/1/2026, Bid deadline 9/9/2026 (11:00 AM CDT).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Heather Mell

[email protected]

(319) 286-5117

Key dates

Opened
8/26/2026
Questions due
9/1/2026
Closes
9/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
PUR0826-041 Addendum 1

Budget estimate

$200,000 – $500,000

The bid package does not disclose a contract value. Based on comparable municipal trail‑repair projects in the Midwest, a scope involving extensive earthwork, geotextile installation, rock‑bag filter units, topsoil placement, and landscaping typically ranges from $200,000 to $500,000. Factors influencing the final amount include the length of trail affected, volume of material to be moved, utility coordination costs, and the required 4‑year warranty bond for water‑system components.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Kenosha County·Wisconsin

Top match · 67%

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Texas Williamson County·Texas

67% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

Alaska Department of Transportation and Public Facilities·Alaska

66% match

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026

California Grants·California

66% match

Lower American River Conservancy Program

Rolling / TBD closeOpened 6/6/2025

City of Green Bay·Wisconsin

65% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Ormond Beach - Purchasing Office·Florida

65% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Minnesota Department of Administration·Minnesota

64% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Cobb County·Georgia

64% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

U.S. Natural Resources Conservation Service·United States of America

64% match

Easement Restoration and Stewardship

Closes 11/19/2026Opened 9/25/2026

Alaska Recreational Trails Program·Alaska

63% match

RTP Grant Application - Girdwood Beaver Pond Trail

Rolling / TBD closeOpened 9/24/2026

California Grants·California

63% match

Riparian Habitat Conservation

Rolling / TBD closeOpened 6/6/2025

California Grants·California

63% match

Coachella Valley Mountains Conservancy Proposition 4 Nature Based Solutions and Climate Adaptation Grant Program

Rolling / TBD closeOpened 3/13/2026

California Grants·California

63% match

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

California Grants·California

63% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

City of Doge City·Kansas

63% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026

U.S. Department Of Transportation·New Jersey

63% match

NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge

Closes 12/15/2026Opened 10/28/2026

California Grants·California

63% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

63% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

Delaware County·Pennsylvania

63% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

Texas Department of Transportation·Texas

63% match

LOCAL LET MAINTENANCE CONTRACT, ATASCOSA CO, EROSION REPAIR

Closes 11/12/2026Opened 10/14/2026

City of Fitchburg·Wisconsin

63% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

City of Hesperia·California

63% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

63% match

AMR, Cambria & Westmoreland Cnties

Closes 11/12/2026Opened 10/16/2026

U.S. Department Of Defense·South Dakota

62% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

California Grants·California

62% match

Forest Conservation

Rolling / TBD closeOpened 6/18/2025