The Tampa-Hillsborough County Expressway Authority (THEA) is soliciting sealed bids from qualified firms to provide all the permits, labor, equipment, materials, tools, transportation, supplies, insurance, incidentals, mobilization and demobilization necessary to perform remediation of the current THEA – East Toll Plaza buildings. The project consists of two buildings, an Administration Building and a Shop Building. The scope of work includes exterior and interior repairs, replacement of damaged components, and cleaning and sanitizing of restrooms.
• Exterior repairs: patch/repair damage to the Exterior Insulation and Finish System (EFIS) on both buildings, inspect and investigate cause of through wall water intrusion at aluminum windows, remove and replace exterior sealant at the perimeter of windows and doors, trim trees that prohibit access to the exterior faces of the buildings, prepare all exterior EFIS surfaces and paint, prepare all exterior door and frame surfaces and paint, clean exterior wall tile, replace broken exterior wall tile to match existing and fill holidays in grout, treat rust and paint all exterior steel railings, power wash all concrete sidewalks, provide and install protective metal trim on the south jamb of the rolling overhead door opening at Shop Building.
• Interior repairs: replace water damaged gypsum board at aluminum windows, replace damaged components of sink base cabinet in break room and finish to match adjacent surfaces, remove resilient coved base, provide and install resilient floor tile in Room 113 in the Administration Building, and install new coved resilient base, replace all vertical blinds at all building windows, cut posts/standards for steel storage shelving to terminate below the finished ceiling, replace missing and damaged acoustical ceiling panels in suspended ceiling to match existing, clean and sanitize four restrooms, two in each building, replace deteriorated vanity counter and splash in Administration Building restroom and reinstall existing top mounted lavatory sink, replace all soap dispensers in all restrooms, replace missing mirror in restroom.
• Mechanical/Electrical/Plumbing (MEP): clean HVAC ductwork, diffusers and grilles in the Administration Building, test and balance HVAC system in the Administration Building to comply with original design requirements, replace PVC condensate piping in the Administration Building with return air plenum approved CPVC piping, replace two inoperable exhaust fans and one inoperable supply fan in the Administration Building, remove abandoned ductless mini-split system in the Administration Building in its entirety including electrical distribution to its source, patch/repair all through wall penetrations to match adjacent surfaces and finishes, clean HVAC ductwork, diffusers and grilles in the Shop Building, test and balance HVAC system in the Shop Building to comply with original design requirements, repair or replace leaking AHU condensate piping and underground drywell for the Shop Building, replace inoperable exhaust fan in the Shop Building, provide and install inoperable water heater in Shop Building in-kind, clean sanitary piping throughout both buildings, replace faucets and flush valves throughout both buildings, insulate hot water piping throughout both buildings, replace interior fluorescent light fixtures throughout the buildings with LED type light fixtures, replace exterior wall mounted wall pack light fixtures on the buildings with LED type light fixtures.