Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›180 TON AIRCOOLED CHILLER

U.S. Department Of Defense·New York

180 TON AIRCOOLED CHILLER

Closes 3/25/2026$100k – $250kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Army is seeking to purchase one 180-ton air-cooled chiller. The chiller must have a power of 460-3-60, 180 tons of cooling capability, suction line insulation, isolation valves, touch pilot display, coil trim panels, upper and lower grills, upper hail guards, aluminum E-coated Fin/Copper tube, and standard ambient temperature. The unit will be delivered to Building 37, South Gate Road, Fort Buchanan, Guaynabo, PR 00934, and the contractor must provide crane service for unloading at the final site. Key features of the chiller include: • 180 tons of cooling capability • Power: 460-3-60 • Suction line insulation • Isolation valves • Touch pilot display • Coil trim panels • Upper and lower grills • Upper hail guards • Aluminum E-coated Fin/Copper tube • Standard ambient temperature

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Diana Ruiz

[email protected]

(787) 707-3346

Key dates

Opened
3/2/2026
Closes
3/25/2026

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
333415
Solicitation №
W911S226U2681

Budget estimate

$100,000 – $250,000

The budget for this opportunity can be estimated based on the cost of a 180-ton air-cooled chiller. The cost of such a unit can range from $50,000 to $200,000, depending on the manufacturer, model, and features. Additionally, the cost of delivery, installation, and crane service for unloading at the final site should be considered. Assuming an average cost of $100,000 for the chiller and $20,000 for delivery and installation, the total budget could be around $120,000. However, this is a rough estimate and the actual budget may vary depending on various factors such as the contractor's expertise, equipment, and labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 68%

16--CHILLER ASSY,AIRCRA

Closes 11/1/2026Opened 9/16/2026

U.S. Department Of Defense·United States of America

68% match

16--CHILLER ASSY,AIRCRA

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of Defense·Pennsylvania

67% match

16--CHILLER ASSY,AIRCRA

Closes 11/1/2026Opened 9/16/2026

Rapides Parish Sheriff's Office·Louisiana

66% match

Addendum #1 100 TON AIR COOLED CHILLER DC3 CORRECTIONS

Closes 11/12/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

66% match

CHILLER

Closes 11/2/2026Opened 10/2/2026

Trident Technical College·South Carolina

66% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

U.S. Department Of Defense·Pennsylvania

66% match

16--CHILLER

Closes 11/1/2026Opened 9/16/2026

University of South Carolina·South Carolina

65% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

Trident Technical College·South Carolina

65% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

UCLA Capital Programs·California

65% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·North Carolina

64% match

RENTAL OF TWO CHILLERS FOR ONE YEAR

Closes 11/10/2026Opened 10/20/2026

University of North Dakota·North Dakota

64% match

UND Abbott Hall Chiller

Closes 11/17/2026Opened 10/20/2026

City of Philadelphia·Pennsylvania

64% match

PW PQ Bid 6703 PHL 1675-16 Satellite Thermal Plant Chiller & Cooling Tower Upgrades - Mechanical

Closes 11/5/2026Opened 10/5/2026

U.S. Department Of Defense·Pennsylvania

64% match

CHILLER

Closes 11/2/2026Opened 10/1/2026

University of Missouri-Kansas City·Missouri

63% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

63% match

16--CHILLER

Closes 11/2/2026Opened 10/2/2026

California Department of General Services·California

63% match

25-320917.FMD.ChillerMaintenance&Repair

Closes 11/17/2026Opened 10/6/2026

U.S. Department Of Veterans Affairs·Texas

63% match

CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION

Closes 12/8/2026Opened 10/30/2026

Virginia Department of Transportation·Virginia

62% match

161109 VDOT Lynchburg Admin Building Chiller Rep

Closes 11/23/2026Opened 10/23/2026

University of North Dakota·North Dakota

62% match

FM365 UND Abbot Chiller

Closes 11/17/2026Opened 10/20/2026

City of Philadelphia·Pennsylvania

62% match

PW Prequalification Bid 6634 PHL 1675-14 Satellite Thermal Plant Chiller & Cooling Tower Upgrades

Closes 11/5/2026Opened 10/5/2026

University of Massachusetts·Massachusetts

62% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026