Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›CUNY LaGuardia Community College M Building AHU…

Dormitory Authority of the State of New York·New York

CUNY LaGuardia Community College M Building AHU Replacement 377320

Closes 8/18/2026$7M – $9MRequest for QualificationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Willdan Energy Solutions (Willdan), as agent for the Dormitory Authority State of New York (DASNY), is seeking qualifications information from firms that would like to participate in a future Bid Solicitation, as the Prime Contractor, for the construction of a project that involves Energy Upgrades at LaGuardia Community College. All interested contractors shall submit a Statement of Qualification and NYS Vendor Responsibility Questionnaire ("VRQ"). Information submitted will be evaluated in order to develop a list of pre-Qualified Bidders for the subject Energy Project that Willdan intends to solicit construction bids for in the third quarter of 2026. A short list of three (3) to five (5) firms will be developed. This short list of Pre-Qualified Bidders will receive the Bid Solicitation. For this project, the successful low bidder, as a condition of being awarded the construction contract, must submit and have approved a project specific Utilization Plan for MBE, WBE and SDVOB Subcontractors in accordance with the goals that will be included in the Bid Documents and must execute a Project Labor Agreement (PLA) that will be included in the Bid Documents. The list of Pre-Qualified Bidders will be selected by Genesys and will be approved by DASNY. The minimum experience level required is as follows: 1. Experience serving as a Prime Contractor on DASNY construction projects; 2. Experience serving as a Prime Contractor for a minimum of five (5) multi-discipline projects that include, Electrical, HVAC, Piping, Instrumentation; 3. Experience serving as Prime Contractor for at least (3) project in excess of $5 million; 4. Similar, recent experience, with Energy Upgrade Projects; 5. Experience in working in and around operating facilities; and 6. Ability to obtain Payment and Performance Bonds for the project. General Project Description: The project consists of replacing and upgrading HVAC equipment and associated architectural, structural, controls, and electrical systems within two mechanical equipment rooms (MER M-318 and MER M-G200). The work includes demolition, installation, commissioning, testing, and integration of new systems while maintaining building operations through coordinated phasing. Replace aging air handling equipment and fan systems in two mechanical rooms with modern, energy-efficient equipment while upgrading supporting architectural, structural, electrical, and controls infrastructure. The project includes full commissioning, integration with the existing Building Management System, staff training, and project closeout documentation to deliver a fully operational HVAC system with minimal disruption to facility operations. Scope of work as follows; General Provide all labor, materials, equipment, supervision, and accessories for a complete, operational system. Verify and replace damaged chilled water pipe insulation to meet the 2020 NYC Energy Conservation Code. Perform testing, adjusting, and balancing (TAB) for all new hydronic and air systems and provide balancing reports. Coordinate equipment startup, operator training, as-built drawings, O&M manuals, warranties, and project closeout documentation. Provide OSHA-compliant fall protection and temporary safety measures during construction. Architectural Perform selective demolition and restoration of roof and wall sections required to remove and install HVAC equipment. Demolish and replace concrete equipment pads for new air handling units (AHUs). Fireproof and weatherproof all roof and wall penetrations. Coordinate work with architectural drawings. Structural Provide temporary roof and wall openings, structural support, and restoration. Remove vibration isolation from existing concrete pads and extend and secure concrete pads as required for new equipment. Furnish and install steel platforms for new return fan installations. Coordinate work with structural drawings. Mechanical MER M-318 Replace supply fans with fan walls, cooling coils, drain pans, piping, valves, controls, and associated ductwork within existing AHUs. Install new return fan walls (or refurbish existing return fans under the alternate scope). Maintain existing hot water coils and associated steam to hot water heat exchangers, pumps, piping and controls Modify AHU interiors as required for installation. Pressure test and seal all new equipment and ductwork. Replace filters for existing AHU-1 and AHU-2. Sequence work to maintain one operating AHU while the other is under construction. MER M-G200 Demolish existing AHU-3, AHU-4, and AHU-5, including associated ductwork and piping and external return fans within the mechanical room. Install three new AHUs with new return fans and new ductwork and piping connected to existing systems. Provide rigging, phasing, and equipment installation within the mechanical room only. Controls Furnish and install complete controls for all new supply fans, return fans, cooling coils, AHUs, valves, dampers, instrumentation, and VFDs. · Survey existing MER M-318 controls to documents existing Sequence of Operations for existing hot water coils and controls revisions will not affect systems outside of MER M-318. Integrate all new equipment in MER M-318 to the existing Building Management System (BMS). Develop new BMS graphics and implement updated sequences of operation. · MER M-G200 to be designed with local unit controls with eventual tie in to existing BMS at later date. Electrical MER M-318 Disconnect and remove existing electrical connections for supply and return fans. Reuse existing electrical risers where applicable. Install new electrical feeds and associated switches for new fan walls, including a new riser from electrical room for Return Fan RF-2. Provide power connections for factory-supplied fan wall control panels. MER M-G200 Disconnect and remove electrical connections to existing AHUs and associated equipment. Remove the existing Motor Control Center (MCC) after installation and commissioning of a new 400A switchboard. Switchboard to be fed from new riser from electrical room. Install new electrical connections and associated switches for new AHUs (supply and return). Transfer existing loads to the new switchboard with coordinated shutdowns to minimize operational impacts. Complete all field verification, wiring, conduit installation, startup, and testing. In addition to the above, all projects include ancillary trade work, including, HVAC, electrical, controls etc. The estimated construction cost range is $7 to $9 Million. Statement of Qualifications The Statement of Qualifications shall include, at a minimum, a Transmittal Letter and the information requested in the below listed TABS, organized in the same manner. Transmittal Letter: In the Transmittal Letter, please indicate the contact information for the individual at your firm who will be receiving communications regarding the bidding of the project (Name, address, phone and fax numbers, and email address). TAB 1: Firm Background The information in this TAB shall include general information on the company background, TAB 2: Relevant DASNY Experience The information in this TAB shall include a list of DASNY projects (minimum of (5) projects and maximum ten (10) projects) where the firm was, or is, the prime contractor. For each of the contracts, provide the following information: 1) Project name; 2) Project location; 3) All project trades (under the prime contract); 4) Firm’s project role; 5) Trade(s) self-performed; 6) Dollar value of Prime Contract; 7) Dollar value of all change orders; 8) Year construction completed; 9) DASNY Reference with contact information; and 10) Owner Reference with contact information. TAB 3: Relevant Project Experience The information in this TAB shall include a list of projects (minimum five (5) projects and maximum ten (10) projects) that clearly demonstrate relevant experience with multi-discipline projects for the replacement of the HVAC Infrastructure for major facilities, for which the firm has been the Prime Contractor. At least one (3) project shall be in excess of $5 Million. Experience in operating, educational facilities preferred. For each of the projects, provide the following information: 1) Project name; 2) Project location; 3) All project trades (under the prime contract); 4) Firm’s project role; 5) Trade(s) self-performed; 6) Dollar value of Prime Contract; 7) Dollar value of all change orders; 8) Year construction completed; 9) DASNY Reference with contact information; and 10) Owner Reference with contact information. TAB 4: NYS Vendor Responsibility Questionnaire ("VRQ") RESPONSES ARE DUE NO LATER THAN August 18, 2026. Please submit one (1) electronic copy of your Statement of Qualifications to: Gina Tomero, Project Coordinator at [email protected].

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gina Tomero(Project Coordinator)

[email protected]

(347) 628-7650

Key dates

Opened
7/29/2026
Closes
8/18/2026

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
236220
Solicitation №
2137618

Budget estimate

$7,000,000 – $9,000,000

Based on the estimated construction cost range of $7 to $9 million, the budget for this project is likely to be within this range, considering the costs of labor, materials, equipment, and other expenses. The actual budget may vary depending on factors such as the complexity of the project, the experience and efficiency of the contractor, and any potential change orders or unforeseen expenses.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Community College System - System Office·Virginia

Top match · 68%

Replace AHUs at CE Building at Northern Virginia Community College, Annandale Campus, PC#M25NV120

Closes 11/10/2026Opened 10/6/2026

University of the District of Columbia·District of Columbia

67% match

AHU Replacement & New Boiler

Rolling / TBD closeOpened 3/17/2020

Northern Virginia Community College·Virginia

67% match

260-B6260-003 MTS Replace Rooftop Unit

Closes 11/2/2026Opened 10/1/2026

Dormitory Authority of the State of New York (DASNY)·New York

65% match

Hostos Community College – Furnish and Install Audiovisual Equipment

Closes 11/13/2026Opened 10/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

University of Massachusetts·Massachusetts

65% match

Anatomy AHU REPLACEMENT

Closes 11/17/2026Opened 10/28/2026

CUNY Baruch College·New York

65% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Horry Georgetown Technical College·South Carolina

64% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

College of Coastal Georgia·Georgia

64% match

CCGA 2705 Coffin Air Handler Replacement

Closes 12/3/2026Opened 10/26/2026

Louisiana's Community and Technical College System·Louisiana

64% match

HVAC Rooftop Units / Chiller Replacement, Northshore Technical Community College, #085 / F.01004592

Closes 11/23/2026Opened 10/22/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Central Ohio Transit Authority (COTA)·Ohio

64% match

AHU Replacement & Repair - McKinley Ave

Closes 11/19/2026Opened 10/19/2026

State University of New York·New York

64% match

AV Upgrade Math 1-125 SBU IFB AV IT Category

Closes 11/18/2026Opened 10/26/2026

City University of New York (CUNY)·New York

63% match

Turnstile System Installation

Closes 11/30/2026Opened 10/22/2026

Dormitory Authority of the State of New York·New York

63% match

CUNY Medgar Evers College – AB1 Domestic Hot Water System Upgrade and Asbestos Abatement (Small Business Concerns and Minority Business Concerns only)

Closes 12/16/2026Opened 10/30/2026

Connecticut UConn Health Center·Connecticut

63% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Palm Beach County PBC·Florida

63% match

Supervisory of Elections HVAC Replacement Project

Closes 11/12/2026Opened 10/27/2026

Los Angeles Community College District·California

63% match

LAHC Fine Arts Music Building RFQ

Closes 11/25/2026Opened 10/21/2026

Dormitory Authority of the State of New York (DASNY)·New York

63% match

REBID: York College – Furnish, Deliver and Provide Training Services of Mobile Light Tower

Closes 11/13/2026Opened 10/16/2026

University of Massachusetts System·Massachusetts

63% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

63% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Ontario International Airport·California

63% match

2027PS001 - Campus-Wide Fire Alarm System Replacement

Closes 11/23/2026Opened 9/25/2026

Corrections and Community Supervision, NYS Dept. of·New York

63% match

Energy Recovery Unit Repair & Controls Replacement

Closes 12/10/2026Opened 10/8/2026

Monroe County School District, FL·Florida

62% match

ITB 2026023 - AC Repairs and Replacements

Closes 11/19/2026Opened 10/22/2026