Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Construction of Bridge and Approaches on Ebenezer Church…

Mississippi Marion County Board of Supervisors·Mississippi

Construction of Bridge and Approaches on Ebenezer Church Road

Closes 5/20/2026$1M – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Marion County Board of Supervisors is seeking bids for the construction of 0.085 miles of bridge and approaches on the Ebenezer Church Road in Marion County, Mississippi. The project includes roadway items such as mobilization, clearing and grubbing, removal of bridge, excavation, and installation of granular material, concrete pipe, and traffic signs. The project also includes erosion control items such as commercial fertilizer, seeding, and temporary silt fence. The bridge items include test piles, prestressed concrete piling, precast concrete slab units, and precast concrete barrier rail. The award will be made to the lowest qualified bidder on the basis of published quantities. The key items of work are: • Roadway items: mobilization, clearing and grubbing, removal of bridge, excavation, and installation of granular material, concrete pipe, and traffic signs • Erosion control items: commercial fertilizer, seeding, and temporary silt fence • Bridge items: test piles, prestressed concrete piling, precast concrete slab units, and precast concrete barrier rail

Attached files

Contact

Rebecca Bell

[email protected]

Key dates

Opened
5/11/2026
Closes
5/20/2026
Duration
45 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
56-20260416081753 BSMC

Budget estimate

$1,000,000 – $2,000,000

The budget for this project can be estimated based on the quantities of the items listed in the bid description. The total cost of the project can be estimated by calculating the cost of each item and summing them up. However, without the unit prices, it is difficult to provide an accurate estimate. Assuming an average cost of $100 per cubic yard of excavation, $50 per ton of granular material, and $500 per linear foot of concrete pipe, the total cost of the project can be estimated to be around $1 million to $2 million. The factors that may influence the likely payment range include the complexity of the project, the location, and the materials used.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of Cheshire·Connecticut

Top match · 67%

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Connecticut Dept. of Transportation·Connecticut

67% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

U.S. Department Of Defense·Michigan

66% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

City of San Antonio·Texas

66% match

23-03935 George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Agency of Transportation - Contract Administration·Vermont

66% match

Mt. Holly BO 1443(56)

Closes 11/13/2026Opened 10/21/2026

NYS Cambria, Town of·New York

66% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

Connecticut Dept. of Transportation·Connecticut

66% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Cuyahoga County·Ohio

66% match

RQ16425: Highland Road Bridge Engineering Services

Closes 11/5/2026Opened 10/5/2026

Georgia Cobb County Department of Transportation·Georgia

66% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Agency of Transportation - Contract Administration·Vermont

66% match

Mt.Holly BO 1443(56)

Closes 11/13/2026Opened 10/21/2026

BREC·Louisiana

65% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Cedar Rapids·Iowa

65% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Shawnee County·Kansas

65% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Virginia Department of Transportation·Virginia

65% match

B30_2027 ON-CALL BRIDGE MAINTENANCE

Closes 11/18/2026Opened 10/14/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

65% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Ormond Beach - Purchasing Office·Florida

65% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Connecticut Town of Cheshire·Connecticut

65% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Minnesota Department of Transportation·Minnesota

65% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Fairfield·Ohio

65% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

Connecticut Dept. of Transportation·Connecticut

65% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Town of Camp Verde·Arizona

65% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Cobb County, GA·Georgia

65% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

65% match

B34_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

City of Columbia·Missouri

65% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

65% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026