Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Civil Engineering
  5. ›River Walk Channel Improvements: Staircase and Sidewalks

Texas City of San Antonio·Texas

River Walk Channel Improvements: Staircase and Sidewalks

Closes 1/27/2026$3M – $4MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of San Antonio is seeking a qualified firm to provide construction services for the River Walk Channel Improvements: Staircase and Sidewalks project. The project consists of repair and rehabilitation of the Riverwalk and other work indicated in the contract documents, including the construction of sidewalks, steps, ramps, retaining walls, handrails, and other work required for the completion of the project. The selected firm will be responsible for providing all necessary labor, materials, and equipment to complete the project. • The project has a construction cost estimate of $2,869,009.00 for the sidewalk and $320,836.00 for the staircase. • The project is expected to be completed within 305 calendar days. • The City is looking for a firm with experience in construction projects similar to this one, as well as experience with green building and sustainability practices. • The firm will be required to provide a price proposal, which will be evaluated based on the lowest price total including the base proposal, allowances, and all alternates. • The firm will also be required to submit a statement of qualifications, which will be evaluated based on the firm's experience, background, and qualifications, as well as its understanding of the project and proposed management plan.

Attached files

Contact

Sandra Rios

[email protected]

(210) 207-5438

Key dates

Opened
12/4/2025
Pre-bid meeting
12/12/2025
Closes
1/27/2026
Duration
305 days

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237990
Solicitation №
2026-019

Budget estimate

$3,000,000 – $4,000,000

Based on the construction cost estimate provided in the document, the budget for this project is estimated to be around $2,869,009.00 for the sidewalk and $320,836.00 for the staircase, for a total of approximately $3,189,845.00. However, this amount may vary depending on the actual costs incurred by the selected firm. The budget will likely be influenced by factors such as the firm's ability to complete the project within the specified timeframe, the quality of the work performed, and the firm's compliance with the contract terms and conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richmond Government·Virginia

Top match · 69%

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Hampton·Virginia

68% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

Charleston County·South Carolina

68% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

NYS East Fishkill, Town of·New York

68% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Madison·Wisconsin

68% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Riverside·California

67% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

North Carolina Town of Knightdale·North Carolina

67% match

Old Knight Road Sidewalk Improvement Project

Closes 11/3/2026Opened 9/18/2026

Town of Bluffton·South Carolina

67% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Fort Wayne·Indiana

67% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

City of Charlotte·North Carolina

67% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Richmond·Virginia

66% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Town of Westwood·Massachusetts

66% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Missouri Department of Transportation·Missouri

66% match

Central District, City of Linn Creek, sidewalk improvements to West Valley Drive

Closes 11/5/2026Opened 9/30/2026

City of Foley·Alabama

66% match

CAFFM Sidewalk Additions

Closes 11/10/2026Opened 10/22/2026

City of Seattle·Washington

66% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Sandy·Utah

66% match

CITY HALL WEST STAIR REPLACEMENT, ADA RAMP & WEST/NORTH LANDSCAPE REDESIGN

Closes 11/6/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Elk Grove·California

66% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

City of Helena·Montana

66% match

2026 Sidewalk Improvement Program RFP

Rolling / TBD closeOpened 3/11/2026

Massachusetts CITY OF WATERTOWN·Massachusetts

66% match

Exterior Monumental Stair Restoration/Reconstruction Design

Closes 11/12/2026Opened 10/28/2026