The Military Sealift Command Norfolk, Strategic Sealift Program Support Office, N103A, is seeking information about the price and availability of U.S. tug/barge services for transporting approximately 7,500 tons of armor stone from various ports in South Korea to Hotel Wharf, Apra Harbor, Guam. The contractor shall provide cradle, cribbing, blocking, and seafastening for ocean transport, as well as independent marine surveyor services. The pricing and technical planning shall be done as part of the fixed price.
• The load port(s)/place(s) are various ports in South Korea.
• The available load date is 20 June 2026.
• The discharging port(s)/place(s) is Hotel Wharf, Apra Harbor, Guam.
• The required delivery date is soonest thereafter.
• The laydays start from 20 June 2026.
• The cargo dimensions and description include a maximum draft of 27 feet and a maximum LOA to be determined.
• The contractor shall perform their own mooring analysis.
• The pricing and technical planning shall be done as part of the fixed price.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.