Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›Park Pedestrian Bridge Handrail

City of Salisbury·Maryland

Park Pedestrian Bridge Handrail

Closes 5/22/2026$100k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Salisbury is seeking a qualified contractor to furnish and install a complete handrail system for the historic pedestrian bridge (Bridge #1) located in City Park. The work includes demolition of the existing rail, installation of new wood railing, a stainless‑steel cable‑rail system, and re‑attachment of the existing ADA‑compliant steel handrail to the new structure. All materials must match the historic character and comply with Maryland Historical Trust guidelines and ADA standards. The contract is a fixed‑price lump‑sum with a 5 % maintenance bond or retainage, and the project must be completed within 60 calendar days after the Notice to Proceed, aiming for final installation by July 4 2026. • Supply and install new 6×6 wood posts, rails, and pickets using approved hardwoods (Red Grandis, Sapele, or Cedar) and stainless‑steel hardware. • Provide and tension a 3/16‑in. stainless‑steel cable‑rail system with vertical spacing ≤ 4 in. for ADA compliance. • Re‑attach the existing historic steel ADA handrail to the new wood structure, following historic‑preservation requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Lowe(Procurement Contact)

[email protected]

(410) 548-3190

Key dates

Opened
4/29/2026
Questions due
5/12/2026
Pre-bid meeting
5/8/2026
Closes
5/22/2026
Duration
60 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990
Solicitation №
ITB 26-129

Budget estimate

$100,000 – $300,000

Based on typical costs for historic handrail replacement (material, fabrication, installation, and specialized historic‑preservation work) and the modest scale of a single bridge, a reasonable estimate is between $100 k and $300 k. The lower bound reflects minimal wood and cable materials; the upper bound accounts for premium hardwoods, stainless‑steel hardware, labor for historic compliance, and the 5 % maintenance bond.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of Cheshire·Connecticut

Top match · 64%

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

64% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Kearney·Missouri

64% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

City of Danville·Virginia

63% match

IFB-26-27-031-Riverfront Park Guardrail and Fence Improvements

Closes 11/17/2026Opened 10/27/2026

Connecticut Town of Cheshire·Connecticut

63% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Delaware River Joint Toll Bridge Commission·New Jersey

62% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

BREC·Louisiana

62% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

U.S. Department Of Transportation·Hawaii

62% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Missouri Department of Transportation·Missouri

62% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

City of Sparta·Tennessee

61% match

Walking Bridge Decking & Handrail Replacement Bid 2026

Closes 11/10/2026Opened 10/26/2026

Camden County·New Jersey

61% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Charlotte·North Carolina

60% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

New York City Department of Transportation·New York

60% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

60% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Fort Myers·Florida

60% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

U.S. Department Of Transportation·Wyoming

60% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

City of San Ramon·California

60% match

Alcosta Senior & Community Center Outdoor Handrail Replacement (CIP #955584)

Closes 12/3/2026Opened 10/29/2026

City of Seattle·Washington

60% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

New York City Department of Transportation·New York

60% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

County of Marin·California

60% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

Town of Westwood·Massachusetts

59% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

City of Richmond Government·Virginia

59% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

U.S. Department Of The Interior·Minnesota

59% match

Y--MN FERGUS FALLS WMD HANDRAIL STAIRS

Closes 11/13/2026Opened 10/27/2026

City of Richmond·California

59% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

City of Goose Creek·South Carolina

59% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026