Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Loeb Well No. 3 Rehabilitation and Pump Replacement

City of Beaumont·Texas

Loeb Well No. 3 Rehabilitation and Pump Replacement

Closes 9/10/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Beaumont is seeking qualified contractors to rehabilitate and replace the pump system at Loeb Well No. 3. The scope includes mobilization of equipment, well video inspection, well cleaning, chlorination, performance testing, supply and installation of a new steel discharge head, column assembly, and a new 6‑stage pump (options for 2,500 gpm, 3,000 gpm, or 3,500 gpm). The contract also requires transport and re‑installation of the existing motor, restoration of the well site, and optional extra work such as acid treatment and brush cleaning. Bidders must submit a complete bid package with all required forms, bonds, and certifications by the deadline. • Mobilization/demobilization of service rig and crew • Video inspection and reporting of well condition • Well cleaning, chlorination, and optional acid treatment • Performance testing (step‑rate and constant‑rate) at four pumping rates • Supply & install steel discharge head, column assembly, and new pump unit (multiple size options) • Transport & reinstall existing motor, oil pot assembly, and start‑up/purge operations • Site restoration to pre‑work condition • Required documentation: bid forms, bond, insurance, conflict‑of‑interest questionnaire, MBE participation, city charter compliance, etc.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brent Schmitt

[email protected]

(409) 730-4409

Key dates

Opened
8/13/2026
Questions due
8/28/2026
Closes
9/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
WU1126-09 Addendum 3

Budget estimate

$200,000 – $500,000

Based on typical municipal well rehabilitation projects of similar size (≈ 260 ft of column pipe, new 6‑stage pump, site restoration, and ancillary services), total contract values generally range from $200,000 to $500,000. Lower end reflects selection of the smallest pump option and minimal extra work; upper end assumes the largest pump size, full optional acid‑treatment, and extensive site restoration. Factors influencing the final amount include pump size selected, any additional cleaning/acid treatment, and prevailing labor/material rates in the Beaumont area.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut City of Meriden·Connecticut

Top match · 69%

Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

City of Albany·Georgia

69% match

Well No. 21 Rehabilitation

Closes 11/16/2026Opened 10/12/2026

Georgia City of Albany·Georgia

69% match

Bid Ref. 27-032 Well No 21 Rehabilitation

Closes 11/16/2026Opened 10/12/2026

City of Aurora, IL·Illinois

68% match

Well 115 Maintenance & Rehabilitation

Closes 11/18/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

City of Branson·Missouri

67% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

Department of Water·Hawaii

67% match

IFB Job No. 27-03, Koloa Well F Pump Replacement, Kauai, Hawaii

Closes 11/12/2026Opened 10/19/2026

Massachusetts Dracut Water Supply District·Massachusetts

67% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

67% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

City of Riverside·California

67% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

Connecticut City of Meriden·Connecticut

67% match

Evansville Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

City of Meriden·Connecticut

67% match

RFP027-34 Platt & Lincoln Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

67% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

City of Meriden·Connecticut

67% match

RFP027-33 Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

People with Developmental Disabilities, NYS Office for·New York

67% match

SOIRA 7266 SR 3(Cranberry Lake) Replacement of Well Pump Project

Closes 11/4/2026Opened 10/7/2026

City of Hollywood·Florida

67% match

SW-2 Bypass Pumping & Rehabilitation (Project No. 25-11070A)

Closes 11/25/2026Opened 10/20/2026

Massachusetts Town of Pembroke·Massachusetts

66% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

Bossier Parish Police Jury·Louisiana

66% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

City of Meriden·Connecticut

66% match

RFP027-35 Evansville East Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026