The IDEA Public Schools are soliciting bids for the construction of a new building addition at the Henry Phase 2 site, located at 5820 Briarwood Ave, Midland, Texas 79707. The project includes a new building addition of approximately 31,950 square feet on two floors, with a steel frame, metal stud walls, brick veneer with EIFS, a new membrane roofing system, student restrooms, a clinic, interior finishes, and a new MEP system. The project also includes tie-ins to existing storm and sanitary drains, new science classrooms with an acid sanitary system, and minor site work grading around the building addition, including a practice soccer field with an irrigation system tied into the city water line. The bond budget for the project is $12,000,000.
• The project requires a pre-bid meeting on February 24, 2026, at 4:00 pm EST.
• Bids are due on March 5, 2026, at 5:00 pm EST.
• The project includes various divisions, including concrete, masonry, metals, wood, plastics, and composites, thermal and moisture protection, openings, finishes, specialties, equipment, and furnishings.
• The project requires compliance with various codes and standards, including the Americans with Disabilities Act (ADA) Accessibility Guidelines and the AASHTO M 252 Standard Specification for Corrugated Polyethylene Drainage Pipe.