Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Dakota guideNorth Dakota Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Dakota
  4. ›Civil Engineering
  5. ›Water Utility Project No. 150

City of Bismarck·North Dakota

Water Utility Project No. 150

Closes 12/10/2025$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bismarck is seeking bids for the construction of a water main and related items. The project includes the installation of approximately 475 LF of 16” watermain, flushing and chlorinating 4,300 LF of existing watermain, and related items. The substantial completion date is 10/23/26, and the final completion date is 11/6/26. Bidders must submit their bids electronically using Quest CDN's vBid by 3:00 PM on 12/10/2025. • The project requires the installation of a new water main and related items. • The contractor must upload a copy of their license and bidder’s bond through QuestCDN. • The bid bond shall be conditioned that if the principal’s bid is accepted and a contract is awarded, the principal shall execute the contract within ten days of receipt of the notice of award. • Digital project documents must be downloaded from www.QuestCDN.com for a $22.00 payment. • An optional paper set of plans and specifications is available for a nonrefundable price of $150.00 per set.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Waylon Erdmann(Project Engineer)

[email protected]

(701) 355-1505

Key dates

Opened
11/19/2025
Closes
12/10/2025
Duration
375 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
1305

Budget estimate

$500,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which includes the installation of approximately 475 LF of 16” watermain, flushing and chlorinating 4,300 LF of existing watermain, and related items. Considering the average cost of water main construction, the total budget could range from $500,000 to $1,500,000. This estimate is based on the assumption that the cost of materials, labor, and equipment will be around $1,000 to $3,000 per linear foot of water main. However, this is a rough estimate and the actual budget may vary depending on various factors such as the complexity of the project, the location, and the contractor's expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Bureau of Reclamation·United States of America

Top match · 70%

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026

Mississippi

69% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

Barnegat Township·New Jersey

69% match

ENGINEERING POOL

Rolling / TBD closeOpened 6/26/2026

Fort Pierce Utilities Authority·Florida

69% match

Continuing Contract for Water & Wastewater Systems Construction and/or Program Management Service ("Project Management")

Closes 11/2/2026Opened 10/6/2026

Eastern Municipal Water District·California

68% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Jefferson Parish Government·Louisiana

68% match

Bid Event # 185 - JEFFERSON PARISH WATERLINE IMPROVEMENTS SOUTH NEW ORLEANS SUBDIVISION JEFFERSON PARISH PROJECT NO. 2023-028-WRB

Closes 11/17/2026Opened 10/7/2026

City of Wilmington·Delaware

68% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

California Grants·California

68% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

Catawba Regional Council of Governments·South Carolina

68% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Jackson County Utility Authority·Mississippi

68% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

U.S. Bureau of Reclamation·United States of America

68% match

WaterSMART: Desalination Construction Projects

Closes 8/26/2027Opened 5/14/2026

City of Ontario·California

68% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Maryland Frederick County Government·Maryland

68% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026

City of Dunedin·Florida

68% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

LA Water & Power·California

68% match

146409 WATER SOFTENER SYSTEM - RINALDI TOLUCA Chlorination Station

Closes 11/13/2026Opened 9/23/2026

City of Idaho Falls·Idaho

68% match

Water Division Inventory Replenishment

Closes 11/2/2026Opened 10/13/2026

NYS Ontario County·New York

68% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

68% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Fort Bend County Municipal Utility District No. 134A·Texas

67% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

Township of Winslow, NJ·New Jersey

67% match

Municipal Utilities Engineer 2027

Closes 11/24/2026Opened 10/1/2026

Alaska Department of Environmental Conservation·Alaska

67% match

Ketchikan Lakes Alternative Raw Water Supply Determination of Categorical Exclusion

Rolling / TBD closeOpened 8/11/2026

Maryland City of Baltimore·Maryland

67% match

PROJECT NO. 1407 WASTEWATER COLLECTION SYSTEM PROGRAM MANAGEMENT

Closes 11/19/2026Opened 9/18/2026

California Grants·California

67% match

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

Massachusetts Executive Office of Energy and Environmental Affairs·Massachusetts

67% match

Drinking Water Supply Protection Grant FY27 RFR

Closes 3/4/2027Opened 10/26/2026

Town of Eatonville·Florida

67% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026