Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Waste Removal and Collection
  5. ›MBW Water Treatment Plant Raw Water and Clarification…

Tennessee Knoxville Utilities Board (KUB)·Tennessee

MBW Water Treatment Plant Raw Water and Clarification Improvements CMAR RFP

Closes 12/17/2025$10M – $50MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Knoxville Utilities Board (KUB) is seeking a Construction Management-At-Risk (CMAR) firm to assist in the design and construction of a new pre-treatment train, raw water distribution structure, and associated yard piping at the Mark B. Whitaker Water Treatment Plant. The project aims to create redundancy and resiliency in the existing water treatment process. The CMAR firm will be responsible for pre-construction services, including cost estimation, scheduling, and permitting, as well as construction services, including soliciting and selecting subcontractors, maintaining a qualified workforce, and ensuring compliance with all applicable codes and regulations. • The project includes the construction of a new pre-treatment train, raw water distribution structure, and associated yard piping. • The CMAR firm will be responsible for pre-construction services, including cost estimation, scheduling, and permitting. • The project requires compliance with all applicable codes and regulations, including those related to environmental sustainability and stormwater management. • The CMAR firm will be required to provide a detailed project schedule, including a critical path schedule and a "look ahead" schedule. • The project includes a 12-month warranty period, during which the CMAR firm will be responsible for addressing any defects or issues that arise.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Abbey Marshall(Procurement Contact)

[email protected]

(865) 558-2798

Key dates

Opened
11/7/2025
Questions due
12/5/2025
Pre-bid meeting
11/18/2025Mandatory
Site visit
11/18/2025Mandatory
Closes
12/17/2025
Projected award
1/16/2026
Duration
1095 days

Last updated

Details

Type
Request for Proposal
Industry
Utilities and Waste Management
NAICS
237110
Solicitation №
3979

Budget estimate

$10,000,000 – $50,000,000

The budget for this project is estimated to be between $10 million and $50 million, based on the scope of work and the complexity of the project. The construction of a new pre-treatment train, raw water distribution structure, and associated yard piping at the Mark B. Whitaker Water Treatment Plant is a significant undertaking that requires specialized equipment, labor, and materials. The estimated budget range takes into account the costs of materials, labor, and equipment, as well as the costs of permitting, inspections, and testing.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Grapevine·Texas

Top match · 70%

CMAR RAW WASTEWATER TREATMENT PLANT IMPROVEMENTS

Closes 11/19/2026Opened 10/21/2026

East Bay Municipal Utility District·California

69% match

RFP - Moraga Raw Water Pumping Plant Rehabilitation and Upgrades Pre-design Services

Closes 11/11/2026Opened 10/1/2026

U.S. Department Of Defense·Massachusetts

68% match

Individual Water Treatment Device (IWTD) for Reduction/Removal of Toxic Industrial Chemicals and Materials

Closes 11/12/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

67% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Pittsylvania County·Virginia

67% match

RFP# 20261014 Hurt Water Treatment Plant

Closes 11/12/2026Opened 10/14/2026

El Paso Water·Texas

67% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Town of Jupiter·Florida

67% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

Oregon City of Ashland·Oregon

67% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Hollywood·Florida

67% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Eastern Municipal Water District·California

67% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Charlotte·North Carolina

66% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026

U.S. Department Of Transportation·Oklahoma

66% match

Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades

Closes 11/19/2026Opened 10/20/2026

Texas Brazos River Authority·Texas

66% match

RFP EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

Closes 11/10/2026Opened 8/3/2026

Florida Keys Aqueduct Authority·Florida

66% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Dept of Natural Resources·Wisconsin

66% match

Private Drinking Water Treatment System Consulting, Equipment and Installation Services – Marinette

Closes 11/13/2026Opened 10/26/2026

Renewable Water Resources·South Carolina

66% match

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

Closes 12/4/2026Opened 10/15/2026

City of Bakersfield·California

66% match

RFQ - Consulting Services for Water Well CBK-81 Construction and L-211 TCP & H2S Treatment

Closes 11/3/2026Opened 10/13/2026

El Paso Water·Texas

66% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

Washington Suburban Sanitary Commission, MD·Maryland

65% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

65% match

Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)

Closes 12/3/2026Opened 10/27/2026

City of Ontario·California

65% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

City of Ashland·Oregon

65% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Bakersfield·California

65% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026