Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Civil Engineering
  5. ›Project 1428 Baltimore Greenway Trail Druid Hill Park to…

Maryland City of Baltimore·Maryland

Project 1428 Baltimore Greenway Trail Druid Hill Park to Lake Montebello (Phase II) Trail Druid Hill Park to Lake

Closes 7/9/2026$3M – $3.6MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Baltimore is seeking a consultant to complete the final design of the Baltimore Greenway Trail - Druid Hill Park to Lake Montebello segment. The project includes advancing the existing 30% designs, developing final bid-ready design plans, and preparing a final advertisement package. The scope of work includes topographic survey and ROW coordination, field investigations and ADA improvements, roadway and trail design, drainage design, stormwater management, and erosion and sediment control. The consultant will also be responsible for natural resources inventory, NEPA support, and maintenance of traffic. • The project is a 2.8-mile multi-use trail that begins in Druid Hill Park and ends at the intersection of East 33rd Street at Hillen Road. • The minimum width of the trail will be 14 ft (at least 10’ wide trail with two 2’ shoulders on each side). • The project includes acquiring surveys, performing a complete 30% design, resubmitting a revised 30% submission, completing final design activities, developing public engagement materials, and preparing a final advertisement package. • The consultant will work with BCDOT and DPW to collect existing roadway as-built information, including existing utility or storm drain information. • The consultant will update the field run topo file based on any pertinent information gathered. • The project is anticipated to be completed within 30 months, with a total funding authority of $3,560,600.

Attached files

Contact

Mae Hanzlik(Project Manager)

[email protected]

(667) 228-6519

Key dates

Opened
5/15/2026
Questions due
5/28/2026
Pre-bid meeting
5/26/2026
Closes
7/9/2026
Duration
30 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
BPM056763

Budget estimate

$3,000,000 – $3,560,600

Based on the project description, the total funding authority for this contract is $3,560,600. This amount will be used to cover the costs of the consultant's services, including design, surveying, and environmental consulting. The budget is expected to be a cost-plus-fixed-fee arrangement, with the consultant submitting monthly progress reports and invoices. The actual budget will depend on the consultant's performance and the progress of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland Department of Natural Resources·Maryland

Top match · 74%

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

Georgia Cobb County Department of Transportation·Georgia

72% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Illinois Natural Resources·Illinois

71% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Gainesville - Procurement Division·Florida

71% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Cobb County·Georgia

70% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Connecticut Town of Simsbury·Connecticut

70% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

City of Cincinnati·Ohio

70% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Goshen, Indiana·Indiana

70% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Camden County·New Jersey

70% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Lake Wales·Florida

69% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

Maryland Department Of General Services·Maryland

69% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Kenosha County·Wisconsin

69% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Green Bay·Wisconsin

69% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

Alaska Department of Transportation and Public Facilities·Alaska

69% match

RTP Grant Application - Eastland Trails Phase 2A

Rolling / TBD closeOpened 9/24/2026

Delaware County·Pennsylvania

68% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

City of Keene·New Hampshire

68% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Connecticut City of Middletown·Connecticut

68% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

Iowa City·Iowa

68% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

City of Middletown·Connecticut

68% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of Green Cove Springs·Florida

68% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

Alaska Department of Transportation & Public Facilities·Alaska

68% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

City of Keene·New Hampshire

68% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Delaware Valley Regional Planning Commission·Pennsylvania

67% match

Feasibility Study for Naylor's Run and Pennsy Trails (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 11/13/2026Opened 10/5/2026

City of Cincinnati·Ohio

67% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Madison·Wisconsin

67% match

SAUK CREEK GREENWAY

Closes 1/28/2027Opened 1/28/2027