The City of Baltimore is seeking a consultant to complete the final design of the Baltimore Greenway Trail - Druid Hill Park to Lake Montebello segment. The project includes advancing the existing 30% designs, developing final bid-ready design plans, and preparing a final advertisement package. The scope of work includes topographic survey and ROW coordination, field investigations and ADA improvements, roadway and trail design, drainage design, stormwater management, and erosion and sediment control. The consultant will also be responsible for natural resources inventory, NEPA support, and maintenance of traffic.
• The project is a 2.8-mile multi-use trail that begins in Druid Hill Park and ends at the intersection of East 33rd Street at Hillen Road.
• The minimum width of the trail will be 14 ft (at least 10’ wide trail with two 2’ shoulders on each side).
• The project includes acquiring surveys, performing a complete 30% design, resubmitting a revised 30% submission, completing final design activities, developing public engagement materials, and preparing a final advertisement package.
• The consultant will work with BCDOT and DPW to collect existing roadway as-built information, including existing utility or storm drain information.
• The consultant will update the field run topo file based on any pertinent information gathered.
• The project is anticipated to be completed within 30 months, with a total funding authority of $3,560,600.