Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Streambank Stabilization, Old Route 30, Townshend Lake…

U.S. Department Of Defense·Massachusetts

Streambank Stabilization, Old Route 30, Townshend Lake, Townshend, VT

Closes 4/16/2026$25k – $100kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers is seeking a contractor to stabilize 310 feet of streambank along the West River in Townshend, VT. The work includes furnishing all labor, materials, and equipment necessary to perform the streambank restoration, which will follow standard practices outlined in the Vermont Rivers and Roads Field Manual. The contractor will be required to provide a site-specific Accident Prevention Plan, conduct daily safety meetings, and ensure compliance with all federal, state, and local safety and health requirements. • The streambank restoration will involve removing enough material to allow for embedding a footer rock (keyway) a minimum of four feet below the channel of the river. • The contractor will construct a stone toe wall with stones of primarily five feet dimensions to resist erosion. • The contractor will backfill voids with three inches minus erosion control stone and ensure that the riprap slope is at a three to one gradient or thirty-three-point three percent grade. • The contractor will provide grass seed, mulch, and erosion control measures as specified in the contract. • The contractor will be required to practice good housekeeping, maintain a safe job site, and restore any damaged areas to the satisfaction of the Technical Point of Contact.

Attached files

Contact

Jennifer Samela(Contracting Officer)

[email protected]

(978) 318-8324

Key dates

Opened
3/6/2026
Closes
4/16/2026
Duration
124 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238910
Solicitation №
W912WJ26QA069

Budget estimate

$25,000 – $100,000

The budget for this contract is estimated to be between $25,000 and $100,000, as stated in the solicitation. This estimate is based on the magnitude of construction, which is expected to be between $25,000 and $100,000. The actual budget will depend on the contractor's quote and the government's evaluation of the quote.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fitchburg·Wisconsin

Top match · 67%

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Virginia Polytechnic Institute and State University·Virginia

66% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/10/2026Opened 10/6/2026

Town of Bennington·Vermont

66% match

TOWN OF BENNINGTON BENNINGTON, VERMONT WATER RESOURCES DIVISION MONUMENT AVENUE EXTENSION DWSRF RF3-559

Closes 11/19/2026Opened 10/6/2026

Catawba Regional Council of Governments·South Carolina

66% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Washakie County Conservation District·Wyoming

65% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Virginia Polytechnic Institute and State University·Virginia

65% match

VT Duck Pond Water Quality Improvements – Pond Edge Restoration

Closes 11/3/2026Opened 10/6/2026

NYS Alden, Town of·New York

65% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

County of Amherst·Virginia

64% match

Route 130 & 210 Water Line

Closes 11/19/2026Opened 9/28/2026

City of Charlotte·North Carolina

64% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

Agency of Transportation - Contract Administration·Vermont

64% match

Topsham BF 031-1(13)

Closes 11/13/2026Opened 10/21/2026

Chittenden County Regional Planning Commission·Vermont

64% match

Ongoing Call: Water Quality Improvement Project Subcontractors

Closes 12/31/2026Opened 12/19/2023

California Grants·California

64% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

City of Gaithersburg·Maryland

64% match

Construction Services for Rabbitt Road Stream and Vegetative Buffer Restoration

Closes 11/9/2026Opened 9/15/2026

City of Charlotte·North Carolina

64% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Maryland Town of Port Deposit·Maryland

63% match

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

St. Louis County, MN - Purchasing Division·Minnesota

63% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

City of Anderson·South Carolina

63% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

North Carolina County of Mecklenburg·North Carolina

63% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·South Dakota

63% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

Connecticut Town of Simsbury·Connecticut

63% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

North Carolina County of Mecklenburg·North Carolina

63% match

Barlowe Road Flood Mitigation and Water Quality Improvement Project

Closes 11/19/2026Opened 10/26/2026