Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Heart Butte Dam Safety of Dams Modification

U.S. Department Of The Interior·Montana

Heart Butte Dam Safety of Dams Modification

Closes 1/4/2026$50M – $200MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Heart Butte Dam Safety of Dams Modification project is a comprehensive construction effort aimed at enhancing the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes dewatering and unwatering systems, cofferdam works, foundation void remediation, outlet works conduit rehabilitation, jet grouting operations, embankment excavation, filter and drainage system construction, toe drain system installation, earth retaining structures, and outlet conduit joint sealing. The government intends to award a Firm Fixed Price contract with a period of performance of approximately 1,277 calendar days. Key aspects of the project include: • Dewatering and unwatering systems to facilitate dry working conditions • Cofferdam works to isolate work areas from reservoir and tailwater influences • Foundation void remediation to fill and stabilize voids or discontinuities within the foundation materials • Outlet works conduit rehabilitation to restore structural capacity and hydraulic performance • Jet grouting operations to improve ground strength and reduce permeability • Embankment excavation to facilitate installation of new filter and drainage systems • Filter and drainage system construction to meet modern dam safety standards • Toe drain system installation to enhance seepage monitoring and control • Earth retaining structures to support excavation faces and permanent embankment features • Outlet conduit joint sealing to prevent internal leakage and mitigate potential piping pathways

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Travis Stephens

[email protected]

0000000000

Key dates

Opened
12/18/2025
Closes
1/4/2026
Duration
1277 days

Last updated

Details

Type
Sole Source
Industry
Civil Engineering
NAICS
237990
Solicitation №
DOIRFBO260003

Budget estimate

$50,000,000 – $200,000,000

The budget for this project can be estimated based on the scope of work and the period of performance. Given the complexity and size of the project, the budget is likely to be substantial. The NAICS code 237990, which includes other heavy and civil engineering construction, suggests that the project may involve significant expenditures on materials, labor, and equipment. The period of performance of approximately 1,277 calendar days also indicates a large-scale project. A rough estimate for a project of this scope could be in the range of $50 million to $200 million, considering the costs of construction, engineering, and other related services. However, this is a rough estimate and the actual budget may vary depending on various factors, including the contractor's expertise, the complexity of the project, and the government's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 68%

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Transportation·Washington

65% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

California Department of Water Resources·California

64% match

Dam Safety Engineering Services ¿ Southern California

Closes 11/17/2026Opened 10/20/2026

City of San Diego·California

63% match

Murray Dam Near Term Repairs - Advertisement Notice Only (no bids)

Closes 12/1/2026Opened 10/6/2026

Massachusetts Town of Bolton·Massachusetts

63% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

U.S. Department Of Transportation·Montana

63% match

MT FLAP SILVER 2021(1), Roosevelt Drive Safety and Realignment Project

Closes 7/27/2028Opened 7/27/2026

City of Columbus Ohio·Ohio

63% match

Hoover Dam Improvements – Part 2

Closes 12/9/2026Opened 10/14/2026

Montana State University·Montana

62% match

Hamilton Hall - Life Safety Improvements

Closes 11/18/2026Opened 10/30/2026

U.S. Department Of Defense·Oregon

62% match

JOHN DAY DAM NAVIGATION LOCK TAINTER VALVE (TV) REPAIRS TV3 AND TV4

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of The Interior·Wyoming

62% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

Gwinnett County Government·Georgia

61% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Ohio Department of Natural Resources·Ohio

61% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

City of Ann Arbor·Michigan

61% match

Professional Engineering Services for Dam Support

Closes 11/10/2026Opened 10/1/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

61% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

County of Stanislaus·California

61% match

Safe Streets and Roads for All Safety Action Plan and Planning Guidelines

Closes 11/19/2026Opened 10/21/2026

City of Seattle·Washington

61% match

Outreach Event: Cascades Dam Tour

Closes 2/26/2027Opened 9/30/2026

Santa Clara Valley Water District·California

61% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

Montana Department of Administration, Architecture & Engineering Division·Montana

61% match

Hamilton Hall - Life-Safety Improvements / 3rd & 4th Floor Renovations

Closes 11/18/2026Opened 10/14/2026

City of Columbus·Ohio

61% match

Hoover Dam Improvements Pt. 2

Closes 11/18/2026Opened 10/13/2026

U.S. Department Of Agriculture·California

61% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

Laramie Rivers Conservation District·Wyoming

61% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Lower Platte North Natural Resources District·Nebraska

60% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

U.S. Department Of Transportation·Washington

60% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

U.S. Department Of The Interior·Colorado

60% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026