Alaska Energy Authority is seeking a qualified contractor to clear a 30‑ft‑wide right‑of‑way for a 2.68‑mile segment of a new 3‑phase transmission line at the Bradley Lake Hydroelectric Project. The work includes removal of trees taller than 10 ft (with special handling for “danger” trees), stump removal, equipment steam‑cleaning, and compliance with strict environmental constraints (no herbicides, proper disposal of logs, and adherence to the Bald & Golden Eagle disturbance window). The contractor must provide all labor, equipment, fuel, and logistics support for a remote, road‑free site reachable only by barge or aircraft, and must coordinate accommodation, barge scheduling, and insurance requirements with the project manager.
• Clear a 30‑ft‑wide corridor for 2.68 mi (STA 0+30 to STA 141+70).
• Remove trees > 10 ft; cut stumps ≤ 2 in.; handle marked “danger” trees on a per‑unit basis.
• No herbicide use; all equipment must be steam‑cleaned prior to arrival.
• Provide fuel tank, arrange barge/air transport, and use on‑site 9‑bedroom dormitory for crew.
• Complete clearing by 15 Oct 2026; contract period may extend to Apr 2027 for equipment removal.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.